Loading...
ADA Transition Plan-Appendix J-Facilities Inventory of BarriersLocation Barrier Barrier Removal Priority 1 Priority 2 Priority 3 Total Cost Plan Date Compl. Date AIRPORT MANAGEMENT BULDING Parking No accessible pkg marked Paint for 1 car, 1 van $ 55 $ 80 $ 80 99/00 Parking No accessible pkg signs 2 signs @ 91.50 $ 183 $ 183 $ 183 99/00 $ 238 Parking Path Path to entr. slope too steep, no rails Lessen slope, install rails $ 3,500 $ 3,500 $ 3,500 99/00 $ 3,500 Lobby Drinking fountain N/A Install Access fountain $ 2,100 $ 1,100 $ 1,100 99/00 $ 2,100 Men's RR MRR - Sink 32".Raise sink $ 220 $ 220 $ 220 99/00 Men's RR Uncovered Pipes Cover pipes $ 50 $ 50 $ 50 99/00 Men's RR Turn Controls - Sink Lever controls $ 70 $ 70 $ 70 99/00 Men's RR Mirror 45"Lower to 38" $ 20 $ 20 $ 20 99/00 Men's RR Soap dispenser @ 43"Lower to 40" $ 10 $ 10 $ 10 99/00 Men's RR Towels @ 60"Lower to 40" $ 10 $ 10 $ 10 99/00 Men's RR Urinal 24"Lower to 17" $ 370 $ 370 $ 370 99/00 Men's RR Stall turn lock Lever lock, loop handle. $ 60 $ 60 $ 60 99/00 $ 810 Men's RR Shower NA Modify for access if shower is to remain $ - 99/00 Men's RR Shower NA Stall and seat $ 3,675 $ 3,675 99/00 Men's RR Shower NA Faucet $ 4,000 $ 325 $ 325 99/00 $ 4,000 Women's RR Border Area, Not Currently Used by Public Modify if become public restroom $ - 99/00 Women's RR Dble entry doors Remove inner doors $ 160 $ 160 $ 160 99/00 Women's RR 31" sink Raise sink to 34" $ 220 $ 220 $ 220 99/00 Women's RR Turn Controls - Sink Lever controls $ 70 $ 70 $ 70 99/00 Women's RR Uncovered Pipes Cover pipes $ 50 $ 50 $ 50 99/00 Women's RR stall turn lock Lever lock, loop handle. $ 50 $ 60 $ 60 99/00 Women's RR Grabs at 36 1/2"Lower to 34-36" $ 70 $ 70 $ 70 99/00 Women's RR Soap dispenser @ 41"Lower to 40" $ 10 $ 10 $ 10 99/00 Women's RR Towels at 54"Lower to 40" $ 10 $ 10 $ 10 99/00 Women's RR Mirror at 46"Lower to 38" $ 20 $ 20 $ 20 99/00 $ 660 Outside Mgr's. Office $ - Path of Travel Spiral stairs not detectable Place plant under stairs $ - $ - $ - Sep-97 $ - Women's Single Use Restroom Outside Mgr's Office $ - Women's RR Entry 27"Widen door to 33" $ 450 $ 350 $ 350 99/00 Women's RR Entry lever hardware Install loop handle/lockset $ 200 $ 200 $ 200 99/00 Women's RR Small sink 31"Install access sink $ 300 $ 300 $ 300 99/00 Women's RR Sink = turn handles Lever controls $ 70 $ 70 $ 70 99/00 Women's RR SInk - uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Women's RR Soap too high Lower to 40" $ 10 $ 30 $ 30 99/00 Women's RR Towels too high Lower to 40" $ 10 $ 20 $ 20 99/00 Women's RR Stall 1 grab @ 36 Install 2nd grab $ 105 $ 50 $ 50 99/00 Women's RR Toilet @ 15 1/2"New Toilet 17-19" $ 400 $ 250 $ 250 99/00 $ 1,595 Men's Single Use Restroom Outside Mgr's Office $ - Men's RR Entry 27"Widen to 33" $ 450 $ 350 $ 350 99/00 Men's RR Entry lever hardware Install loop handle/lockset $ 200 $ 200 $ 200 99/00 Men's RR Stall door 24"Remove partition $ 250 $ 200 $ 200 99/00 Men's RR Small sink 31"Install access sink $ 300 $ 300 $ 300 99/00 Men's RR Sink = turn handles Lever controls $ 70 $ 70 $ 70 99/00 Men's RR SInk - uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Men's RR Soap too high Lower to 40" $ 10 $ 30 $ 30 99/00 Men's RR Towels too high Lower to 40" $ 10 $ 20 $ 20 99/00 Men's RR Mirror @ 46"Lower to 38" $ 20 $ 20 $ 20 99/00 Men's RR Stall 1 grab @ 36 Install 2nd grab $ 105 $ 50 $ 50 99/00 Men's RR Toilet @ 15 1/2"New Toilet 17-19" $ 400 $ 250 $ 250 99/00 2017 Men's RR Urinal at 24"Lower to 17" $ 370 $ 370 $ 370 99/00 $ 2,235 General Office Areas $ - 99/00 Turn hardware Replace w/levers, as replaced(#10) $ 2,000 $ 2,000 $ 2,000 99/00 No signage Signs (10 @ 26) $ 260 $ 260 $ 260 99/00 Alarms Audible/Visual alarms (4 @ 175) $ 700 $ 700 $ 700 99/00 $ 2,960 subtotal $ 18,098 contingency $ 1,809 TOTAL $ 19,907 $ 9,863 $ 4,670 $ 2,000 $ 16,533 roundup $ 20,000 *************************** ***************** AIRPORT TERMINAL BUILDING Parking Lot 2 spaces, no signs. 2 signs and 1 Van access sign $91.50/ea $ 275 $ 275 $ 275 98/99 Parking Lot Yellow paing at parking areas Repaint parking spaces $ 80 $ 20 $ 20 98/99 Parking Lot Slope across median too steep Lower sidewalk, reramp to 1:12 maximum $ 272 $ 2,500 $ 2,500 98/99 Entrance No pedestrian crossing markings Paint crossing and install sign $ 120 $ 75 $ 75 98/99 $ 747 Entrance Slope into terminal no handrails Install handrails $ 760 $ 760 $ 760 98/99 Entrance External phone ctls at 47-54", no volume ctrl Lower to 48" at ctrls, adapt for volume ctrl $ 200 Need Price 98/99 Entrance Phone space obstructed by waste/ash tray Move waste and ash tray $ - $ - $ - 98/99 $ 960 Main Terminal 2 $ - 98/99 Main Terminal Fire extinguisher protrudes by gate exit Place plant under or move to corner $ - $ 20 $ 20 98/99 Main Terminal Internal phone ctrls @ 47-58" no volume ctrl Lower to 48" at ctrls, adapt for volume ctrl $ 200 Need Price 98/99 Main Terminal Aviz/Hertz Counters @ 47 1/2"Lower to 28-34" 4' section $ 152 $ 290 $ 290 98/99 Main Terminal Mesa Counters @ 48 1/2" high Lower to 28-34" 4' section $ 152 $ 145 $ 145 98/99 Main Terminal Pop machine ctrols 33"-50 1/2"Vendor to install w/ ctrls at 48" or less $ - Need Price 98/99 Main Terminal Drinking fountain 40" high, push ctrls not working Install accessible fountain $ 2,100 $ 1,100 $ 1,100 98/99 $ 2,604 Restrooms - Both $ - Restrooms - Both 33" dble doors, light weight, 61" x 55" vestibule Remove inner doors $ 100 $ 150 $ 150 98/99 Restrooms - Both Sink 33" on countertop Install new lav & remove countertop $ 796 $ 400 $ 400 98/99 Restrooms - Both Sink turn controls Lever controls $ 140 $ 70 $ 70 98/99 Restrooms - Both Sink - uncovered pipes Cover pipes $ 100 $ 50 $ 50 98/99 Restrooms - Both Sink clear space 30x40 Increase clear space to 30x48" $ - Need Price 98/99 Restrooms - Both Men's stall 41x81 Reconfigure to 5x5 stall with grab bars $ 1,380 $ 840 $ 840 98/99 Restrooms - Both Men's turn lock, small exterior loop Lever lock and larger loop handle $ 60 $ 200 $ 200 98/99 Restrooms - Both Women's stall 40x71 Reconfigure to 5x5 stall with grab bars $ - $ 840 $ 840 98/99 Restrooms - Both Women's turn lock, small exterior loop Lever lock and larger loop handle $ - $ 200 $ 200 98/99 Restrooms - Both Men's soap 50"Locate 40-48" not over countertop $ 20 $ 10 $ 10 98/99 Restrooms - Both Men's Dryer 43"Locate 40-48" not over countertop $ 60 $ 20 $ 20 98/99 Restrooms - Both 2 mirrors 44"Locate 38" not over countertop $ 40 $ 10 $ 10 98/99 Restrooms - Both Women's soap 50"Locate 40-48" not over countertop $ - $ 10 $ 10 98/99 Restrooms - Both Women's dryer 51 1/2"Locate 40-48" not over countertop $ - $ 20 $ 20 98/99 Restrooms - Both Women's towels 54"Locate 40-48" not over countertop $ 10 $ 10 $ 10 98/99 Restrooms - Both Men's urinal (2) at 24"Lower 1 to 17" maximum $ 370 $ 370 $ 370 98/99 $ 3,076 Signage None Signs at restrooms, telephone, exits (10) $ 260 $ 260 $ 260 98/99 TTY TTY - None Install public TTY and appropriate sign $ - $ 699 $ 699 98/99 Alarms Alarms Provide visible/audible (4) $ 700 $ 175 $ 175 98/99 Loading Assistance Purchase lift $ 16,600 $ 15,000 $ 15,000 2001 $ 17,560 subtotal $ 24,947 contingency $ 2,494 Total $ 27,441 $ 8,385 $ 1,134 $ 15,000 $ 24,519 roundup $ 28,000 *************************** *************************** ** ANIMAL SHELTER (now Animal Services Center of the Mesilla Valley) $ - Parking One space by shelter entrance 0 sign Install sign $ 184 $ 92 $ 92 99/00 Parking Above space painted white Paint in Federal Blue $ 35 $ 20 $ 20 99/00 Parking Above - Asphalt ramp into access aisle Remove asphalt, cut curb $ 550 $ 100 $ 100 99/00 Parking One space by Office door, 0 sign Install sign, move space next to curb $ - $ 92 $ 92 99/00 Parking Above space painted white Paint in Federal Blue $ - $ 20 $ 20 99/00 $ 769 Shelter Entrance Loop handle - door too heavy Adjust door to 5# $ - $ 20 $ 20 99/00 Shelter Entrance Entrance obstructed by chairs Remove chairs from entrance $ - $ - $ - Dec-97 Shelter Entrance Vestibule b/t dble doors - vending machines Remove/move vending machines $ - $ - $ - Dec-97 $ - Lobby Area Pamphlet rack 20"-60" reach Purchase rack with reach < 48" $ 100 $ 100 $ 100 99/00 Lobby Area Fountain out of order 38" at spout Install accessible fountain $ 2,100 $ 1,100 $ 1,100 99/00 $ 2,200 Path of Travel Inter.Writing surfaces in kennel areas (4)Install flip-down work surfaces $ 320 Need Price 99/00 $ 320 Restrooms - Both Single Use Restrooms Entry doors too heavy Adjust doors (2) to 5# max $ - $ 40 $ 40 99/00 Restrooms Door lock at 60"Lower locks to max 48" $ 150 $ 40 $ 40 99/00 Restrooms Sinks 32", lever ctrls, uncovered pipes Cover pipes (2) $ 100 $ 100 $ 100 99/00 Restrooms Towel dispensers at 52"Lower (2) to 40-48" $ 20 $ 20 $ 20 99/00 Restrooms Urinal at 15"OK $ - Restrooms Inappropriate signs Install (2) RR signs 60" AFF $ 52 $ 52 $ - 99/00 $ 322 subtotal $ 3,611 contingency $ 361 TOTAL $ 3,972 $ 1,695 $ 100 $ - $ 1,795 roundup $ 4,000 *************************** *************************** **** APODACA POOL/PARK (pool closed, park has new restrooom building) Parking 1 space, blocks curb cut, no sign Relocate space and add van space $ 60 $ 160 $ 160 98/99 Parking No signage Install 2 signs at parking spaces $ 184 $ 183 $ 183 98/99 $ 224 Entrance Service counter @ 40"Lower 4' section to 28-34" $ 1,150 $ 290 $ 290 98/99 $ 1,150 Pool area Drinking fountain not accessible Install accessible fountain $ 2,100 $ 3,000 $ 3,000 98/99 Pool area No access to wading pool Install ramp Use portable ramp $ 2,000 $ - 1998 Season Pool area 14' portable ramp w/ rails at 16 & 32"Install ramp $ 308 Need Price 98/99 $ 4,408 Women's Restroom Not accessible Provide accessible toilet stall $ 1,193 $ 470 $ 470 98/99 Women's Restroom No grab bars Install grab bars $ 140 $ 100 $ 100 98/99 Women's Restroom Turn hardware on stall Install lever hardware $ 30 $ 50 $ 50 98/99 Women's Restroom Toilet paper dispenser in wrong place Toilet paper dispenser $ 10 $ 50 $ 50 98/99 Women's Restroom Mirror at 30"Mount at 38" $ 20 $ 10 $ 10 98/99 Women's Restroom Sink not accessible Install sink w/ lever controls, cover pipes $ 400 $ 300 98/99 Women's Restroom Soap on mirror at 58"Install at 40" beside sink $ 10 $ 10 $ 10 98/99 Women's Restroom Towel dispenser at 58"Lower to 40" $ 10 $ 10 $ 10 98/99 Women's Restroom No accessible shower stall Install shower stall $ 4,000 $ 5,000 $ 5,000 98/99 $ 5,813 Men's Restroom No accessible stall Provide 5x5 stall w/ grab bars $ 1,193 $ 1,020 $ 1,020 98/99 Men's Restroom No accessible shower stall Install shower stall $ 4,000 $ 5,000 $ 5,000 98/99 Men's Restroom Small sink 33", no knee clearance Install sink w/ lever controls, cover pipes $ 400 $ 300 $ 300 98/99 Men's Restroom Mirror at 30"Raise to 38" $ 20 $ 10 $ 10 98/99 Men's Restroom Soap at 58"Lower to 40" $ 10 $ 10 $ 10 98/99 Men's Restroom Towels @ 58"Lower to 40" $ 10 $ 10 $ 10 98/99 $ 5,633 Park Area No accessible picnic tables 5 tables @ $600/ea $ 3,000 $ 3,000 $ 3,000 98/99 Park Area Fountain SE of tennis 37", turn handle, slab sunk Concrete slab 6x6, accessible fountain $ 3,300 $ 3,061 $ 3,061 98/99 Park Area Fountain NW side of park Concrete slab 6x6, accessible fountain $ 3,300 $ 3,061 $ 3,061 98/99 $ 9,600 Tennis Courts No path of travel to courts Ramp 100 x 4 $ 2,000 $ 1,000 $ 1,000 98/99 Tennis Courts Threshold to tennis courts 5"Ramp entrance above to correct $ 700 in above $ 2,700 West RR's Threshold 2" from dirt 300+600?????? Do not recomme nd repair of existing facility West RR's Open toilet stalls, toilet 18" off center, 1 grab 30 1/2" Erect modular restroom facilities in lieu of repair $50,000 West RR's Sink 31", push controls, exposed pipes West RR's No mirrors or dispensers Install mirror @ 38 and dispensers 40-44 $ 16,000 Need Price $ 16,000 Signs Reservation sign Should include TTY or NMRS number $ 185 $ 185 subtotal $ 45,713 contingency $ 4,571 TOTAL $ 50,284 $ 25,105 $ 1,000 $ - $ 26,105 roundup $ 51,000 *************************** *************************** * BENAVIDEZ COMMUNITY CENTER Power Door Turned off Leave on at all times $ - $ - $ - Jul-97 Restrooms - Both Wastebaskets block access to towels Purchase smaller containers $ 400 $ 30 98/99 Main Rec Room South exit step down to sand lot Install 4x6 temporary ramp $ 200 $ 84 98/99 Main Rec Room Suggestion box at 46"Lower to 40" $ 10 $ 10 98/99 Main Rec Room Monthly banner protrudes into path of travel Relocate $ - $ - $ - Jul-97 Office Area Offensive typed poster Remove $ - $ - $ - Jul-97 $ 610 subtotal $ 610 contingeny $ 61 TOTAL $ 671 $ 124 $ - $ - $ 124 roundup $ 700 *************************** *************************** * BRANIGAN CULTURAL CENTER Parking 14 spaces, 1 accessbile, hazardous area Reconfigure: 1 car & 1 van, stripe $ - $ 15 $ 15 97/98 Parking Inadequate signs for parking 2 parking signs $ - $ 183 $ 183 97/98 Courtyard Entry Sidewalk uneven, raised, pitted, uneven path Replace 10 slabs, 25 SF $ 2,200 $ 300 $ 300 97/98 $ 2,200 Entry Way Tile floor lip adjoining carpet Install threshold reducer $ 900 $ 1,536 $ 1,536 97/98 Entry Way Brochure rack obstructed by boxes Move boxes $ - $ - $ - Jul-97 Entry Way Info counter 39"Add lower work center 28-34" $ 1,100 $ 1,200 $ 1,200 97/98 $ 2,000 Gift Shop Single door open of double door set Keep both doors open $ - $ - $ - Jul-97 Gift Shop Items hanging from pillars into path of travel Remove objects from pillars $ - $ - $ - Jul-97 $ - Restrooms - Both Door opening too narrow 31"Widen to 33" $ 850 $ 700 $ 700 97/98 Restrooms - Both Turn handle on door Install loop/lever hardware & lock ste $ 400 $ 400 $ 400 97/98 Restrooms - Both Sink w/ vanity, not accessible Remove vanity, install lav $ 1,000 $ 750 $ 750 97/98 Restrooms - Both Mirror too high Mount mirror at 38+D2" $ 50 $ 40 $ 40 97/98 Restrooms - Both Partitions - both Reconfigure to 5x5 single use, w/ lever lock $ 200 $ 800 $ 800 97/98 Restrooms - Both Toilet paper and soap/towels wrong location Relocate per specifications $ 20 $ 40 $ 40 97/98 Restrooms - Both Inappropriate signs and location Raised ltr/Braille -mount on wall $ 72 $ 52 $ 52 97/98 $ 2,592 $ 2,592 Women's RR Maneuvering room to enter blocked by portwall Move portable wall to allow 18" room $ - $ - $ - Jul-97 Women's RR Toilet unlevel and unstable Tighten toilet $ 100 $ - $ - Jul-97 $ 100 Men's RR Threshold to high due to tile floor Install threshold reducer $ 75 $ 64 $ 64 97/98 $ 75 Signage 6 sigms for exits, restrooms, fountain,phone $ 216 $ 156 $ 156 97/98 Fountain 35" at wataer flow, push ctrls require force Adjust or purchase new $ 2,100 $ 1,200 $ 1,200 97/98 Alarms 5 visual alarms (175/ea) $ 875 $ 875 $ 875 97/98 $ 3,191 ramp to platform $ 3,300 subtotal $ 13,458 contingency $ 1,345 TOTAL $ 14,803 $ 8,311 $ - $ - $ 8,311 roundup $ 15,000 *************************** *************************** * BRANIGAN FINE ARTS CENTER (now Fine Arts Museum) Entire building to be remodeled and access issues addressed at that time 1997/98 FY Parking 1 space with sign Repaint and add van accessible space $ 106 $ 106 1997/98 Restrooms - Both Door pull force > 10#Adjust door operations to 5# force $ 20 $ 20 1997/98 TOTAL $ - $ 126 $ - $ - $ 126 *************************** *************************** * BRANIGAN LIBRARY Parking Inadequate signage for 9 accessible spaces Install 9 signs (91.50/ea) $ 750 $ 824 $ 824 97/98 Parking No van accessible parking Paint and sign one space $ 80 $ 104 $ 104 97/98 Parking Blacktop ramps to sidewalk, improper, steep Remove blacktop, install curb cuts (5) $ 4,670 $ 63 Price low? 97/98 Sidewalk Heavily pitted in front of acc. parking Repair sidewalk $ 1,000 $ 400 $ 400 97/98 Entry Ramp Uneven slope, no level landing intermediate Install 40' ramp with landing, even slope $ 6,000 $ 16,328 $ 16,328 97/98 Entry Ramp Handrails uneven, highest at 41"Install 40' double handrails and extend 12" $ 6,500 $ 522 $ 522 97/98 $ 19,000 Power door Closes in 10 seconds Adjust to 20 second minimum $ - $ 20 $ 20 97/98 $ - Telephone Alcove not accessible Reconfigure, remove wall, mount phone $ 910 $ 550 $ 550 97/98 1000 estimate in '92 Telephone No TTY Install sign, TTY at counter $ 36 $ 26 $ 26 97/98 $ 946 Reference Counter 41" high, low surface houses PC Relocate PC to allow use of lower counter $ - $ 325 $ 325 97/98 $ - Signs Stairs not marked as "no entrance"Install directional signs for entry (2) $ - $ 200 $ 200 97/98 $ - Fountain 34" at spout, push ctrls, 24" knee height Install new fountain, 27" knee, 36" spout $ 2,100 $ 1,100 $ 1,100 97/98 Fountain Childrens 25 1/2" high, 28" spout Provide paper cups at counter $ - $ - $ - $ - $ - $ 2,100 1st Flr W Restroom Entry door 31 3/4" into 37" hall Remove wall to allow door & maneuvering space $ 2,167 $ 550 $ 550 97/98 1st Flr W Restroom Sink 33 1/2" w/ 29" knee height, U/C Pipes Cover pipes $ 50 $ 50 $ 50 97/98 1st Flr W Restroom Soap 37" over second sink out of reach move to side wall next to access sink $ 10 $ 10 $ 10 97/98 1st Flr W Restroom No 5x5 stall Reconfigure to provide full access stall $ 405 Need Price 97/98 $ 2,632 1st Flr M Restroom Urinal at 24"Lower to 17" $ 370 $ 370 $ 370 97/98 1st Flr M Restroom Sink 33 1/2" w/ 29" knee height, U/C Pipes Cover pipes $ 50 $ 50 $ 50 97/98 1st Flr M Restroom ????? stall size Reconfigure to provide full access stall $ 405 Need Price 97/98 1st Flr M Restroom Dryer @ 45", protrudes 8 1/2"Relocate to reduce impact of protrusion $ 75 $ 30 $ 30 97/98 1st Flr M Restroom 1 horizontal grab in stall Install second grab bar behind toilet @ 33" $ 70 $ 50 $ 50 97/98 $ 2,785 2nd Flr W Restroom Entry door heavy, verticle lever Replace door and loop handle $ 200 $ 350 $ 350 97/98 2nd Flr W Restroom Full size stall, door opens into stall Reconfigure so door opens out $ 85 Need Price 97/98 2nd Flr W Restroom Sink 35 1/2", 29" knee, lever, covered Lower sink to 33" $ 532 $ 220 $ 220 97/98 2nd Flr W Restroom Soap 47" over counter Move to side of sink at 40" $ 10 $ 10 $ 10 97/98 2nd Flr W Restroom Sign mounted to door Mount raised/braille sign on latch side wall $ 10 $ 10 $ 10 97/98 $ 837 2nf Flr M Restroom Entry door heavy, verticle lever Replace door and loop handle $ 650 $ 350 $ 350 97/98 2nd Flr M Restroom Entry door opens into clear space Remove and relocate door $ - $ 2,000 $ 2,000 97/98 2nd Flr M Restroom Urinal at 24 1/2"Lower to 17" $ 370 $ 370 $ 370 97/98 2nd Flr M Restroom Sink/Counter at 35"Lower sink $ 368 $ 220 $ 220 97/98 2nd Flr M Restroom Towels at 53"Lower to 40-48" $ 10 $ 10 $ 10 97/98 2nd Flr M Restroom Sign mounted to door Mount raised/braille sign on latch side wall $ 10 $ 10 $ 10 97/98 $ 1,408 Signs Install signs, 30 throughout library $ 1,080 $ 780 $ 780 97/98 $ 1,080 ER Exits No visual alarms Install visual alarms $ 1,650 $ 525 $ 525 97/98 ER Exits ER paths obstructed keep ER paths clear $ - $ - $ - Jul-97 Aug-97 ER Exits ER Exit by #65 obstructed Move empty Rack $ - $ - $ - Jul-97 Aug-97 ER Exits ER off chidrens area blocked PC station Move PC station $ - $ - $ - Jul-97 Aug-97 $ 1,650 Book Drop Curb cut too steep Repair and renovate sidewalk and drive pad $ 1,000 $ 1,000 $ 1,000 1997/98 $ 1,000 Study/Typing Rooms No maneuvering room once inside Reconfigure desks against wall $ 500 $ 200 $ 200 98/99 Study/Typing Rooms Desks 26 1/2", 23" knee height Raise 1 desk to 29" knee height $ - $ 325 $ 325 98/99 Study/Typing Rooms Entry door hardware = turn handles Replace with levers (3 doors) $ 375 $ 45 $ 45 98/99 $ 875 Collections Aisles 13-15, 31-33 too narrow Widen to 36" $ - x 98/99 Collections Aisle 18 currently 31"Widen to 36" $ - x 98/99 Collections Aisle 60 currently 21"Widen to 36" $ - x 98/99 Collections Aisle by Large Print mtls obstructed Reconfigure to provide path of travel 36" $ - x 98/99 Collections Aisles by Audio Casette racks too narrow Widen to 36" $ - x 98/99 $ - Dresp Rooms Inaccessible sink area Modify counters and sink $ 2,000 $ 340 $ 340 98/99 Dresp Rooms Entry door does not open 90 degrees Shave bottom of door $ 50 $ - 1997 $ 2,050 Elevator No emergency intercom or instructions Install non-voice intercome with instructions $ 1,000 $ 906 $ 906 98/99 Elevator Car 52x69" (51x68 required)No barrier $ - $ - $ 1,000 Children's Area Seating 29 1/2" high, 23 knee height need 24" knee height tables - Adj Table $ - Carol to send informatio n on adjustabl e tables 98/99 Children's Area Tables 23 1/2" with 21" knee height need 24" knee height tables - Adj Table $ - Carol to send informatio n on adjustabl e tables 98/99 Children's Area Aisle b/t carpet wall and round wall 27 1/2"Widen to 33" -Remove wall $ 100 97/98 Children's Area Stack 4-5 currently 32"Widen to 36" $ - $ - $ - Sep-97 Sep-97 Children's Area Stack 5-9, 32-36 too narrow Widen to 36" $ - $ - $ - Sep-97 Sep-97 $ 100 Children's Restroom Sink 19 1/2", uncovered pipes, turn handle Cover pipes, level controls $ 120 $ 120 $ 120 97/98 Children's Restroom Soap 37"Lower to 35" $ 10 $ 20 $ 20 97/98 Children's Restroom Towels 38 1/2"Lower to 35" $ 10 $ 20 $ 20 97/98 Children's Restroom Toilet 16", door 23", no grab bars, push/pull lock Widen door, toilet OK, install grabs $ 1,940 $ 1,000 $ 1,000 97/98 $ 2,080 Periodical Area Path of travel obstructed by newspaper rack Reconfigure $ - $ - $ - Sep-97 Sep-97 Periodical Area Tables 28" high, 26" knee height Purchase 1 table with 29" knee clearance $ - $ 325 $ 325 98/99 $ - New Mexico Room Tables 28" high, 26" knee height Purchase 1 table with 29" knee clearance $ - $ 325 $ 325 98/99 $ - Reference Computers Desks 28 3/4" high 26 1/2" knee hgt Purchase 1 table with 29" knee clearance $ - $ 325 $ 325 98/99 Reference Computers Reference tables 29" high, 26" knee height Purchase 1 table with 29" knee clearance $ - $ 325 $ 325 98/99 Reference Computers Aisle 31 b/t encyclopedia & computer table Increase to 36" $ - $ - $ - 98/99 $ - Interior Ramps Railings at 31"Raise to 34-36" from floor $ 1,840 $ 360 $ 360 98/99 $ 1,840 subtotal $ 41,383 contingency $ 4,138 TOTAL $ 45,521 $ 28,556 $ 3,506 $ - $ 32,062 roundup $ 46,000 *************************** *************************** * BURN LAKE Parking 10 accessible parking spaces req'd & 1 Van Stripe $ 250 $ 65 $ 65 99/00 Parking No signs for accessible parking Install signs w/ 1 Van accessible Sign $ 920 $ 915 $ 915 99/00 $ 1,170 Path of Travel No path to picnic table area Pave pathway (92 estimate) $ 1,600 $ 1,000 $ 1,000 99/00 Path of Travel No access to beach area Pave pathway (92 estimate) $ 1,600 $ 1,000 $ 1,000 99/00 Path of Travel No path to concession area Pave pathway (92 estimate) $ 1,600 $ 1,000 $ 1,000 99/00 Path of Travel No path to soccer field Pave pathway (92 estimate) $ 1,600 $ 1,000 $ 1,000 99/00 $ 6,400 Women's RR Entry door not operable with closed fist Install loop handle at 42" $ 75 $ 45 $ 45 99/00 Women's RR Transition to entrance needed Pave 4-5' ramp to restoom entrance $ 625 $ 100 $ 100 99/00 Women's RR Uneven floor within restroom Pave smooth floor $ 200 $ 100 $ 100 99/00 Women's RR Sink 35", no lever, uncovered pipes Lower sink 34", lever control and cover pipes $ 340 $ 340 $ 340 99/00 Women's RR Stall 5x5 with turn hardware Install lever hardware $ 30 $ 30 $ 30 99/00 Women's RR Shower broken, uneven floor, no grab bars Repair, level floor, push controls, grab bars $ 4,500 $ 450 $ 450 99/00 Women's RR Toilet paper dispenser on back wall Relocate to side, mount under grab $ 10 $ 10 $ 10 99/00 Women's RR No signage Install raised/braille signon wall $ 36 $ 26 $ 26 99/00 Women's RR No waste receptacles Install waste receptacles $ - $ 100 $ 100 99/00 $ 5,816 Men's RR Front door loop handle tooo high Lower to 42" $ 75 $ 45 $ 45 99/00 Men's RR Urinal 23"Lower to 17" $ 370 $ 370 $ 370 99/00 Men's RR Stall door open inward, small loop at 43"Adjust door to open outward with larger loop $ 480 $ 60 $ 60 99/00 Men's RR Toilet paper dispenser on far wall Move below grab bar 12" in front of toilet $ 10 $ 10 $ 10 99/00 Men's RR Transition to entrance needed Pave 4-5' ramp to restoom entrance $ 625 $ 100 $ 100 99/00 Men's RR Uneven floor within restroom Pave smooth floor $ 200 $ 100 $ 100 99/00 Men's RR Shower broken, uneven floor, no grab bars Repair, level floor, push controls, grab bars $ 4,500 $ 450 $ 450 99/00 Men's RR No signage Install raised/braille signon wall $ 36 $ 26 $ 26 99/00 Men's RR No waste receptacles Install waste receptacles $ - $ 100 $ 100 99/00 Men's RR No sink Install accessible sink $ 400 $ 300 $ 300 99/00 $ 6,696 Porta Potty 1 1/2" ramp lip at base, no level landing Build accessible ramp $ 200 $ 200 99/00 Porta Potty 32" in front of toilet, 32" to side for transfer Requires 36' in front $ - 99/00 Porta Potty TP dispenser 52" above Mount at 40" $ 10 $ 10 99/00 $ - Public Telephone Controls at 49"Lower so controls are at 48" $ 200 $ 70 $ 70 99/00 Drinking Fountain No accessible fountains Install 1 @ soccer field, 1@ lake area $ 9,000 $ 3,000 $ 3,000 99/00 $ 9,200 subtotal $ 29,282 contingency $ 2,928 TOTAL $ 32,210 $ 9,952 $ 1,070 $ - $ 11,022 roundup $ 33,000 *************************** *************************** * CITY SERVICE CENTER (now Castañeda Service Center) Path of Travel Candy dispenser protrudes Move to each wall $ - $ - 99/00 Path of Travel Suggestion box protrudes Relocate $ 20 $ 10 $ 10 99/00 Path of Travel Fire hose box protrudes Build legs to floor for cane detection $ 120 $ 80 $ 80 99/00 $ 140 Signs Rooms signs hang from ceiling Install signs (9) $ 324 $ 234 $ 234 99/00 $ 324 Doors All doors too heavy Adjust to 5# (5) $ - $ 20 $ 20 99/00 $ - Restrooms Neither restroom is accessible Reconfigure all fixtures & walls $ 6,000 ????? 99/00 $ 6,000 Facilities Mgmt Office Counter too high Lower section or all to 28-34" $ 1,100 $ 3,600 $ 3,600 99/00 Facilities Mgmt Office Chair obstructs access to counter Remove chair $ - $ - $ - Sep-97 Sep-97 $ 1,100 ER Exits Loading dock stairs Provide 58.5 ramp - modular & handrails $ 2,200 ???? 99/00 $ 2,200 subtotal $ 9,764 contingency $ 976 TOTAL $ 10,740 $ 344 $ 3,600 $ - $ 3,944 roundup $ 11,000 *************************** *************************** * 1501D East Hadley, COMMUNITY SERVICES & FACILITIES DIRECTOR'S OFFICES Entrance 8" step up Ramp entrance to 1:12 (8' ramp0 $ 2,300 $ 1,904 $ 1,904 99/00 $ 2,300 Lobby Chairs block accessible path of travel Relocate chairs $ - $ - $ - 99/00 Lobby Offices have turn hardware Leave doors open or install loops (3) $ 600 $ 600 $ 600 99/00 $ 600 Men's Restroom Establish unisex due to doorway restrictions in women's restroom $ - Included below Men's Restroom Turn handle on entry door Install lever/loop $ 200 $ 200 $ 200 99/00 Men's Restroom Soap at 51 1/2"Lower to 40-48" $ 10 $ 10 $ 10 99/00 Men's Restroom Mirror at 55"Lower to 40" $ 20 $ 20 $ 20 99/00 Men's Restroom Sink 35 1/2"Lower to 33-34" $ 340 $ 220 $ 220 99/00 Men's Restroom Sink Install lever cntrols $ 120 $ 70 $ 70 99/00 Men's Restroom Sink Cover pipes $ 50 $ 50 $ 50 99/00 Men's Restroom TP located 25" above floor Mount under grab bar 12" in front of toilet $ 10 $ 10 $ 10 99/00 Men's Restroom Towels 54"Lower to 40-48" $ 10 $ 10 $ 10 99/00 Men's Restroom Mop blocks access to toilet Relocate mop storage $ 20 $ - $ - 1997 Men's Restroom No grab bars Install grab bars (2) $ 140 $ 50 $ 50 99/00 Men's Restroom Toilet 32" from wall Reconfigure to 5x5-Relocate toilet $ 280 $ 220 $ 220 99/00 $ 1,200 Women's Restroom Entry door 23 3/5"Configure to ambulatory stall -Use Unisex $ - Included in above 99/00 Women's Restroom Turn handle on entry door Install lever/loop $ 200 $ 200 $ 200 99/00 Women's Restroom Mirror too high over counter Relocate to 40" AFF $ 20 $ 20 $ 20 99/00 Women's Restroom Towels 55" over counter Relocate to 40" AFF $ 10 $ 10 $ 10 99/00 Women's Restroom Soap 53" over counter Relocate to 40" AFF $ 10 $ 10 $ 10 99/00 Women's Restroom Vanity sink not accessible Install accessible sink $ 460 $ 400 $ 400 99/00 $ 700 Emergency exit Step down Build ramp 6' x 4' $ 1,340 $ 1,340 subtotal $ 6,140 contingency $ 614 TOTAL $ 6,754 $ - $ 3,404 $ 600 $ 4,004 roundup $ 6,800 PARKS AND RECREATION BUILDING, 1501-J East Hadley (pre- engineereed metal building) Parking Parking @ street w/ sign Move parking to inside fence,paint,sign $ 50 $ 80 $ 80 99/00 Parking Parking 7'x4' sand path b/t park & sidewalk No need to repair if move parking $ 100 $ - $ - 99/00 Parking Parking - fence gate not open far enough Keep completely open & anchor open $ - $ - $ - 99/00 $ 150 Entrance 2 1/2" threshold at door Reduce threshold $ 120 Need Price 99/00 Entrance Entry door turn hardware Replace with lever lockset $ 200 $ 200 $ 200 99/00 Entrance Entry - inner screen door Remove screen $ 30 $ 20 $ 20 99/00 $ 350 Women's Rroom Entry door - turn hardware Replace with lever handle $ 200 $ 200 $ 200 99/00 Women's Rroom All sorts of storage block access inside RR Move storage to another area $ - $ - 97-98 Women's Rroom Sink 31 1/2", 27" knee Install accessible sink at 34", 29" knee $ 300 $ 1,100 $ 1,100 99/00 Women's Rroom Sink - turn controls Install lever controls $ 70 $ 70 $ 70 99/00 Women's Rroom Sink - uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Women's Rroom Towels 53 1/2" & 58" both sides of sink Remove 1, lower 1 40-48" side of sink $ 10 $ 20 $ 20 99/00 Women's Rroom Soap over sink at 40"Move to side wall with relocated towels $ 10 $ 10 $ 10 99/00 Women's Rroom Mirror 51"Lower to 40" $ 20 $ 10 $ 10 99/00 Women's Rroom 2 stalls 42x42, no grab bars Reconfigure to provide 5x5 $ 1,700 Need Price 99/00 Women's Rroom Stalls - no grab bars Install 2 sets of grab bars $ 140 $ 100 $ 100 99/00 $ 2,500 Men's Rroom Entry door - turn hardware Replace with lever handle $ 200 $ 200 $ 200 99/00 Men's Rroom Sink 32", 27" knee height Install accessible sink at 34", 29" knee $ 420 $ 1,100 $ 1,100 99/00 Men's Rroom Towels (2) either side of sink 52"Remove 1, lower 1 40-48" side of sink $ 10 $ 20 $ 20 99/00 Men's Rroom Soap 47"OK $ - $ - Men's Rroom Mirror 47"Lower to 40" $ 20 $ 10 $ 10 99/00 Men's Rroom Urinal 25"Lower to 17" $ 370 $ 370 $ 370 99/00 Men's Rroom 2 stalls 42x42, no grab bars Reconfigure to provide 5x5 $ 1,700 Need Price 99/00 Men's Rroom Stalls - no grab bars Install 2 sets of grab bars $ 140 $ 100 $ 100 99/00 Men's Rroom Shower - not accessible Employee use only $ - $ - $ - $ - $ - 99/00 Men's Rroom Path to access thru office 27"Widen doorway to provide public access $ 1,800 Need Price 99/00 $ 4,660 subtotal $ 7,660 contingency $ 766 TOTAL $ 8,426 $ 300 $ 3,360 $ - $ 3,660 roundup $ 8,500 STREETS BUILDING Parking No designated parking or curb cut Designate one space, sign, curb cut $ 950 Need Price 99/00 $ 950 Entry Door West Turn handle Install lever handle $ 200 $ 200 $ 200 99/00 Entry Door West 2 1/2" step and threshold Reconfigure to provide path of travel $ 780 Need Price 99/00 Entry Door West No maneuvering room to exit door Should door swing the other direction? $ - $ - 99/00 $ 980 Main Hall Furniture on both sides - 36" path of travel Locate furniture all on one side of all $ - $ - $ - $ - $ - 99/00 Drinking Fountain Floor model - not accessible Install accessible fountain $ 2,100 $ 1,100 $ 1,100 99/00 $ 2,100 Women's RRoom Sink 32 1/2" with 29" knee room Install new accessible sink $ 300 $ 300 $ 300 99/00 Women's RRoom Sink turn controls Install lever control $ 70 $ 70 $ 70 99/00 Women's RRoom Sink uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Women's RRoom Towels 58"Lower to 40-48" $ 10 $ 20 $ 20 99/00 Women's RRoom Soap (2) at 51"Lower to 40-48" $ 20 $ 40 $ 40 99/00 Women's RRoom Mirror 43"Lower to 40" maximum $ 20 $ 20 $ 20 99/00 Women's RRoom Storage unit located across from sink Move unit on same wall as sink $ - $ - $ - $ - $ - 99/00 Women's RRoom Stall - no entry handle (wooden door)Install loop handle $ 30 $ 50 $ 50 99/00 Women's RRoom Stall - small slide inner lock Install larger lock operable closed fist $ 20 Need Price 99/00 Women's RRoom Stall 45x81 with toilet centered Reconfigure to 5x5 stall $ 1,820 Need Price 99/00 Women's RRoom Stall - no grab bars Install grab bars $ 140 Need Price 99/00 Women's RRoom Stall - TP Dispenser broken Repair mounting at wall $ 20 Need Price 99/00 Women's RRoom Stall - sanitary controls at 43, 37" from floor Move unit along side sink outside stall $ 20 Need Price 99/00 $ 2,520 Men's Rroom Sink 32 1/2" with 27" knee room Install accessible sink $ 300 Need Price 99/00 Men's Rroom Sink uncovered pipes Cover pipes $ 50 Need Price 99/00 Men's Rroom Sink turn controls Lever controls $ 70 Need Price 99/00 Men's Rroom soap at 44"OK $ - $ - 99/00 Men's Rroom Towels at 57"Lower to 40-48" $ 10 $ 20 $ 20 99/00 Men's Rroom Mirror 45"Lower to 40-48" $ 20 $ 20 $ 20 99/00 Men's Rroom Urinal at 25 1/2"Lower to 17" $ 370 $ 370 $ 370 99/00 Men's Rroom Hall to stall 25"Reconfigure to allow access to stall $ 1,235 Need Price 99/00 Men's Rroom Hall to stall 25"Remove shower $ 275 Need Price 99/00 Men's Rroom No maneuvering room to exit door Reconfigure for maneuvering rom $ 400 Need Price 99/00 Men's Rroom Shower used for storage Remove shower $ 500 Need Price 99/00 $ 3,230 East Door Steep curb ramp to turn hdle door 2 1/2" threshold Used only by employees - $ - $ - $ - $ - $ - $ - Breakroom Sink and cabinets not accessible Not necessary $ - $ - $ - $ - $ - $ - subtotal $ 9,780 contingency $ 978 TOTAL $ 10,758 $ - $ 2,260 $ - $ 2,260 roundup $ 11,000 *************************** *************************** * EAST MESA RECREATION CENTER Parking 1 space, w/ sign, not stripped Paint space $ 40 $ 10 $ 10 98/99 Sidewalk ramp 21' L with 9" rise, no rails Install handrails $ 610 $ 550 $ 550 98/99 Side ramp Too steep - not accessible Not path of travel $ - $ - $ - 98/99 $ 650 Front Counter 48 1/2" high with glass enclosure Lower 4' section, remove glass partition $ 900 $ 170 $ 170 98/99 Recreation rooms Entry from TV toom to Rec room 6" step down,Dangerous landing, install raining $ 320 $ 300 $ 300 98/99 Recreation rooms Table seating, fixed tables 29" high, 27" knee Purchase 1 table to allow wheelchairs $ - $ 325 $ 325 98/99 $ 1,220 Women's Restroom Sink 33", UC pipes Cover pipes $ 50 $ 50 $ 50 98/99 Women's Restroom Small lever lock on stall Increase size of lock - operate closed fist $ 40 $ 50 $ 50 98/99 Women's Restroom Towels at 51"Lower to 40-48" $ 10 $ 10 $ 10 98/99 Women's Restroom Trash container blocks path to stall Move container $ - $ - $ - Oct-97 $ 100 Men's Restroom Uncovered pipes on sink Cover pipes $ 50 $ 50 $ 50 98/99 Men's Restroom Small lever lock on stall Increase size of lock - operate closed fist $ 40 $ 50 $ 50 98/99 Men's Restroom Soap @ 50"Lower to 40-48" $ 10 $ 10 $ 10 98/99 Men's Restroom Towels at 51"Lower to 40-48" $ 10 $ 10 $ 10 98/99 $ 110 Signs Restroom signs on door Mount on wall 60 AFF (2) $ 72 $ 20 $ 20 98/99 Signs Mark ER exits (3) $ 108 $ 78 $ 78 98/99 $ 180 subtotal $ 2,260 contingeny $ 226 TOTAL $ 2,486 $ 1,188 $ 495 $ - $ 1,683 roundup $ 2,500 *************************** *************************** * EASTSIDE COMMUNITY CENTER Parking 2 north, 2 west - no signs Install 4 sigsn $ 400 $ 366 $ 366 98/99 $ 400 Women's Restroom Waste container blocks accessible stall Purchase smaller container and move $ - $ 100 $ 100 98/99 Women's Restroom Entrance door handle too narrow Install wider loop handle $ 200 $ 45 $ 45 98/99 Women's Restroom Loop on stall door too narro1 Install lever on stall door $ 40 $ 30 $ 30 98/99 Women's Restroom Ambulatory stall Reconfigure to provie 5x5 $ 2,790 $ 800 $ 800 98/99 Women's Restroom Towels 55"Lower to 40: $ 10 $ 10 $ 10 98/99 $ 3,040 Men's Restroom Waste container blocks accessible stall Purchase smaller container and move $ - $ 100 $ 100 98/99 Men's Restroom Entrance door handle too narrow Install wider loop handle $ 200 $ 45 $ 45 98/99 Men's Restroom Ambulatory Stall Reconfigure to provie 5x5 $ 2,790 $ 800 $ 800 98/99 Men's Restroom Urinal at 24"Lower to 17" $ 370 $ 370 $ 370 98/99 Men's Restroom Towels 55"Lower to 40-48" $ 10 $ 10 $ 10 98/99 $ 3,370 Main Dining Room 5% of table need height 28-34 wit 27" knee (2)Purchase 2 tables $ - $ 650 $ 650 98/99 $ - subtotal $ 6,810 contingency $ 681 TOTAL $ 7,491 $ 2,676 $ 650 $ - $ 3,326 roundup $ 7,500 *************************** *************************** * FIRE STATION 1 - PICACHO Parking 1 space w/ sign, ramp too steep Remove and replace 4' x 4' ramp $ 640 ??? Need Price 98/99 Entrance Power door malfunctioning Replace door opener $ 2,000 $ 1,500 $ 1,500 98/99 $ 2,640 Training Room Door swings into hallway Reverse door swing $ 510 $ 75 $ 75 98/99 $ 510 Men's RR Front Entry door - turn hardware Install loop handle $ 200 $ 50 $ 50 98/99 Men's RR Front 2 sinks @ 30"Install accessible sink (new) $ 400 $ 220 $ 220 98/99 Men's RR Front Sinks uncovered pipes Cover pipes $ 50 $ 100 $ 100 98/99 Men's RR Front Sinks - turn controls Install lever controls $ 120 $ 70 $ 70 98/99 Men's RR Front Mirror at 32"Adjust to 36" when sink raised $ 20 $ 20 $ 20 98/99 Men's RR Front 1 stall, 44x55 Reconfigure to 5x5 stall $ 2,200 $ 800 $ 800 98/99 Men's RR Front Stall, no grab bars Install 2 grab bars $ 140 $ 100 $ 100 98/99 Men's RR Front Toilet at 15 1/2:New toilet 17-19" $ 720 $ 220 $ 220 98/99 Men's RR Front No urinals $ - $ 370 $ 370 98/99 $ 3,850 Women's RR Front Entry door heavy Adjust to 5# maximum $ - $ 20 $ 20 98/99 Women's RR Front 2 stalls 48x67 - not accessible Convert men's room to unisex $ 3,900 $ - $ - 98/99 Women's RR Front Sink 31"Install new sink $ 400 $ 220 $ 220 98/99 Women's RR Front Sink uncovered pipes Cover pipes $ 50 $ 50 $ 50 98/99 Women's RR Front Sink - turn controls Install lever controls $ 120 $ 70 $ 70 98/99 Women's RR Front Towels at 54"Lower to 40-48" $ 10 $ 10 $ 10 98/99 $ 4,480 Drinking Fountain OK ok $ - $ - $ - 98/99 Fire prevention Prog Accessible counter - OK ok $ - $ - $ - 98/99 Bay Area Drinking fountain not accessible Install accessible fountain $ 2,100 $ 1,100 $ 1,100 98/99 Path of Travel First aid box in hallway protrudes 6" at 48"Move box out of path of travel $ 20 $ 10 $ 10 98/99 Alarms Audible only Install 2-3 visual alarms $ 525 $ 525 $ 525 98/99 Signs None compliant Install signs for bathrooms $ 144 $ 52 $ 52 98/99 Kitchen Not accessible being remodeled - work area $ - $ - Path of Travel From pool room to living, missing tiles Fill in 4" wide 15' L with carpet $ 200 ??? Need Price 98/99 Rear Restroom Not accessible - limited space Install directional sign to front restrooms $ 36 $ 3,025 $ 26 $ 26 98/99 subtotal $ 14,505 contingency $ 1,450 TOTAL $ 15,955 $ 4,508 $ - $ 1,100 $ 5,608 roundup $ 16,000 *************************** *************************** * FIRE STATION 1 - CODES ENFORCEMENT Parking No designated space Stripe and sign for 1 space $ 120 $ 112 $ 112 98/99 Entrance No ramp access to bldg Provide parallel ramp 10x4x8 $ 1,600 ??? Need Price 98/99 $ 1,720 Men's Restroom Very small loop handle on inside Install larger loop handle $ 200 $ 70 $ 70 98/99 Men's Restroom 2 stalls 32x55 Reconfigure to 5x5 $ 930 $ 800 $ 800 98/99 Men's Restroom Stalls small turn locks Install lever lock (2) $ 80 $ 100 $ 100 98/99 Men's Restroom Stalls no grab bars Install grab bars $ 140 $ 100 $ 100 98/99 Men's Restroom Toilets 15 1/2"Raise both to 17-19" $ 900 $ 250 $ 250 98/99 Men's Restroom Sink 31", lever controls, covered pipes Raise sink to 34" $ 520 $ 200 $ 200 98/99 Men's Restroom Mirror at 50 1/2"Lower to 40" $ 20 $ 20 $ 20 98/99 Men's Restroom Towels at 54"Lower to 40" $ 10 $ 10 $ 10 98/99 Men's Restroom Trash container blocks maneuvering space Move trash container $ - $ - $ - Aug-97 Men's Restroom Floor scrubber & chair block space Remove both $ - $ - $ - Aug-97 $ 2,800 Women's Restroom Entry door turn hardware Replace w/ lever hardware $ 200 $ 70 $ 70 98/99 Women's Restroom Trash container blocks path of travel Remove container $ - $ - $ - Aug-97 Women's Restroom 2 stalls 48x60 Reconfigure to 5x5 stall $ 1,450 $ 800 $ 800 98/99 Women's Restroom Stalls - no grab bars Install grab bars in 1 $ 140 $ 100 $ 100 98/99 Women's Restroom Toilet paper dispenser Mount below grabs 12" in frt of toilet $ 10 $ 10 $ 10 98/99 Women's Restroom Seat cover dispenser at 44"Mount below garbs $ 10 $ 10 $ 10 98/99 Women's Restroom Stall door small turn lock, no outer loop Install lever lock and exterior loop handle $ 40 $ 60 $ 60 98/99 Women's Restroom Sink 31" covered, levers Raise sink to 34" $ 520 $ 200 $ 200 98/99 Women's Restroom Towels & soap at 50:Lower both to 40-48" $ 10 $ 20 $ 20 98/99 Women's Restroom Mirror (very small) at 50"Replace mirror and mount at 38" $ 20 Need Price 98/99 $ 2,400 Signs None compliance Install at restrooms (2) $ 72 $ 52 $ 52 98/99 $ 72 Victim Assistance Locked door with window at 54"Replace door with sidelight $ 1,200 Need Price 98/99 Victim Assistance Security entry pad at 48"OK $ - $ - ER Exits Exit to 6" step down Install ramp @ rear ER exit $ 1,000 $ 1,428 $ 1,428 98/99 $ 1,000 Alarms No visual alarms Install 4 $ 700 $ 700 $ 700 98/99 Sidewalk No curb cut from Fire to Police Install curb cut at driveway $ 900 Need Price 98/99 $ 1,600 subtotal $ 9,592 contingency $ 959 TOTAL $ 10,551 $ 5,112 $ - $ - $ 5,112 roundup $ 11,000 *************************** *************************** * FIRE STATION #2 - FOSTER Parking/Entrance Front entrance not usable Install directional sign $ 100 $ 92 $ 92 99/00 Entrance Rear, 6" step Install ramp (6') $ 1,000 $ 1,428 $ 1,428 99/00 Entrance Assistance bell mount Mount at 40-48" $ 100 $ 75 $ 75 99/00 Parking No designated spaces Stripe and sign 1 space $ 80 $ 82 $ 82 99/00 $ 1,280 Restroom off Dorm 15" toilet Raise to 17-19" $ 720 $ 250 $ 250 99/00 Restroom off Dorm 31" sink New Sink 34" $ 400 $ 220 $ 220 99/00 Restroom off Dorm Sink turn controls Lever controls $ 120 $ 70 $ 70 99/00 Restroom off Dorm Sink uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Restroom off Dorm Dispensers 58"Lower to 40-48" $ 10 $ 10 $ 10 99/00 $ 1,300 Restroom-Main 30" stall door into restroom Widen to 33" with 5# push/pull $ 700 $ 130 $ 130 99/00 Restroom-Main Sink 32"New Sink 34" $ 400 $ 220 $ 220 99/00 Restroom-Main Sink turn controls Lever controls $ 120 $ 70 $ 70 99/00 Restroom-Main Sink uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Restroom-Main Dispensers 58"Lower to 40-48 and locate near sink $ 30 $ 10 $ 10 99/00 Restroom-Main Toilet at 15" between 2 walls, no grab bars Reconfigure to provide 5x5 Unisex $ 1,180 $ 2,500 $ 2,500 99/00 Restroom-Main Urinal 24"Lower to 17" $ 370 $ 370 $ 370 99/00 $ 2,850 Kitchen Not accessible, can enter, turn and exit No modifications necessary $ - $ - subtotal $ 5,430 contingency $ 543 TOTAL $ 5,973 $ 5,626 $ - $ - $ 5,626 roundup $ 6,000 *************************** *************************** * FIRE STATION 3 - VALLEY Parking Dirt lot at rear, no designated parking Developing parking at front, 1 space w/sign $ 1,300 Need Price 99/00 Path of Travel No path from front to entrance Developing sidewalk fr parking to door $ 720 Need Price 99/00 Front Door Button operated, ringer at 44"OK $ - Need Price 99/00 Thresholds Throughout building 3/4-1" high Replace all (4) thresholds $ 200 Need Price 99/00 Path of Travel Door into livingroom too narrow Remove door & frame to obtain 33" $ 200 Need Price 99/00 $ 2,420 Restroom Front Not accessible, off dorm, limited options Directional sign - maintain staff only $ 36 $ 26 $ 26 99/00 $ 36 Back restroom/Shower Door opening 29"Widen door to 33" $ 2,000 Need Price 99/00 Back restroom/Shower Door opens into clear floor space of first sink Designate 2nd sink as accessible $ - $ - $ - 99/00 Back restroom/Shower Entry door too heavy Adjust door opener to 5# $ - $ 20 $ 20 99/00 Back restroom/Shower Entry door, small push lock Install larger lever lock $ 200 $ 20 $ 20 99/00 Back restroom/Shower 2 sinks 32 1/2"Raise 1 sink to 34" $ 100 $ 200 $ 200 99/00 Back restroom/Shower Sinks - uncovered pipes Cover pipes (2) $ 100 $ 100 $ 100 99/00 Back restroom/Shower Sinks - turn controls Install lever controls (2) $ 140 $ 140 $ 140 99/00 Back restroom/Shower Mirror at 48"Lower to 40" over accessible sink $ 20 $ 20 $ 20 99/00 Back restroom/Shower Urinal at 22 1/2", control at 52"Lower to 17", controls at 48" max $ 370 $ 370 $ 370 99/00 Back restroom/Shower Toilet 16" b/t wall and shower wall Reconfigure - move showers, relocate toilet $ 405 $ 1,020 $ 1,020 99/00 Back restroom/Shower Showers - not accessible Not necessary - but move to other wall $ 1,600 in above Back restroom/Shower Rug/mat obstructs smooth path Remove rug from ctr of restroom $ - $ - $ - Dec-97 Back restroom/Shower Towel dispenser 51"Lower to 40-48" $ 10 $ 10 $ 10 99/00 $ 4,945 Signs None Install sign for back restroom 60" AFF $ 36 $ 26 $ 26 99/00 $ 36 subtotal $ 7,437 contingency $ 743 TOTAL $ 8,180 $ 1,952 $ - $ - $ 1,952 roundup $ 8,200 *************************** *************************** * FIRST STATION #4 - Missouri Parking 1 space w/ curb cut,no sign Install sign $ 100 $ 92 $ 92 99/00 Parking 50' ramp from parking to level surface, no rails Needs intermediate landing and handrails $ 3,000 $ 3,000 $ 3,000 99/00 $ 3,100 Women's Restroom Sink, turn controls Lever controls $ 70 $ 70 $ 70 99/00 Women's Restroom Sink - uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Women's Restroom Toilet 15"Raise toilet to 17-19" $ 450 $ 250 $ 250 99/00 Women's Restroom Toilet stall turn lock Install lever lock $ 40 $ 30 $ 30 99/00 Women's Restroom Ambulatory stall Configure 5x5 stall $ 1,790 $ 220 $ 220 99/00 Women's Restroom Shower not accessible Not used by public, no modifications $ - $ - $ - 99/00 $ 2,400 Men's Restroom Sink, turn controls Lever controls $ 70 $ 70 $ 70 99/00 Men's Restroom Sink - uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Men's Restroom Toilet 15"Raise toilet to 17-19" $ 450 $ 250 $ 250 99/00 Men's Restroom Toilet stall turn lock Install lever lock $ 40 $ 30 $ 30 99/00 Men's Restroom Ambulatory stall Configure 5x5 stall $ 1,790 $ 220 $ 220 99/00 Men's Restroom Toilet stall turn lock Install lever lock $ 40 $ 30 $ 30 99/00 Men's Restroom Tp too far in front of toilet mount at 12" in front of toilet $ 10 $ 10 $ 10 99/00 Men's Restroom Dispensers over counter out of reach Relocate to within 48" reach range $ 40 $ 10 $ 10 99/00 Men's Restroom Shower not accessible Not used by public, no modifications $ - $ 2,490 subtotal $ 7,990 contingency $ 799 TOTAL $ 8,789 $ 3,942 $ 440 $ - $ 4,382 roundup $ 8,800 *************************** *************************** * FIRE STATION #5 - HIGHWAY 70 (now Bataan Memorial East) Parking 1 space w/ sign, not striped Stripe space $ 100 $ 10 $ 10 99/00 $ 100 Women's Restroom Entry door heavy 11#Adjust to 5# $ - $ 20 $ 20 99/00 Women's Restroom Sink - uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Women's Restroom Soap dispenser over counter at 48"Move to side wall 4" in from rim of counter $ 10 $ 10 $ 10 99/00 Women's Restroom Towels 51", protrudes 6"Relocate at 40-48" in area doesn't impact travel $ 10 $ 10 $ 10 99/00 Women's Restroom Ambulatory Stall Reconfigure to provide 5x5 stall $ 1,800 $ 800 $ 800 99/00 Jul-97 Women's Restroom Shower accessible - no bench Not used by public $ - $ - $ - 99/00 $ 1,870 Men's Restroom 31" entry dooway after initial entrance Widen door to 33" $ 2,000 $ 1,000 $ 1,000 99/00 Men's Restroom Ambulatory Stall Reconfigure to provide 5x5 stall $ 1,800 $ 800 $ 800 99/00 Men's Restroom Sink - uncovered pipes Cover pipes $ 50 $ 50 $ 50 99/00 Men's Restroom Soap dispenser over counter at 48"Move to side wall 4" in from rim of counter $ 10 $ 10 $ 10 99/00 Men's Restroom Towels 51", protrudes 6"Relocate at 40-48" in area doesn't impact travel $ 10 $ 10 $ 10 99/00 $ 3,870 subtotal $ 5,840 contingency $ 584 TOTAL $ 6,424 $ 1,170 $ 1,600 $ - $ 2,770 Roundup $ 6,500 $ - *************************** *************************** * $ - FRENGER POOL $ - $ - Parking 2 Accessible + 1 Van, water pools in a.m.Reconfigure to park up at bldg side of lot $ 1,500 Need Price 97/98 $ 1,500 Women's Room TP dispenser in access stall unreachable Mount on brick 12" in front of toilet 19" AFF $ 30 $ 10 $ 10 97/98 Women's Room Soap dispenser unreachable in corner Relocate to even with sink front at 10-48" $ 10 $ 10 $ 10 97/98 Women's Room Sanitary product dispener protrudes @ corner at 50"Relocate against corner w/ ctrls at 40-48" $ 30 $ 20 $ 20 97/98 Women's Shower Stool at 15.5"Purchase stool at 17-19" $ 200 $ 150 $ 150 97/98 Changing Area No lower clothes hanging area Cut part of bench and install hangers 40-48" $ 130 $ 150 $ 150 97/98 $ 400 Fountain Pool Area 34" AFF, obstructed by hose Install accessible fountain $ 2,100 $ 1,100 $ 1,100 97/98 Hoyer Lift No sign indicating availability Install sign $ 36 $ 26 $ 26 Oct-97 Pool Ramp Install ramp or lift $ 14,000 $ 14,000 $ 14,000 97/98 $ 16,136 Men's Room TP dispenser in access stall unreachable Mount on brick 12" in front of toilet 19" AFF $ 30 $ 10 $ 10 97/98 Men's Room Soap dispenser unreachable in corner Relocate to even with sink front at 10-48" $ 10 $ 10 $ 10 97/98 Men's Shower Stool at 15.5"Purchase stool at 17-19" $ 200 $ 150 $ 150 97/98 Changing Area No lower clothes hanging area Cut part of bench and install hangers 40-48" $ 130 $ 150 $ 150 97/98 $ 400 Pool Single rails entering pool Install handrails both sides of stairs. $ - Included in ramp price 97/98 $ - Tennis Courts No path of travel to tennis courts 100'Pave path 4' x 100' $ 1,200 $ 1,500 $ 1,500 98/99 $ 1,200 subtotal $ 19,636 contingency $ 1,963 TOTAL $ 21,599 $ 15,786 $ 1,500 $ - $ 17,286 roundup $ 22,000 *************************** *************************** * LIONS PARK Jul-97 Parking No designated parking stripe/sign 3 spaces + 1 van accessible $ 400 $ 394 $ 394 99/00 Signs Reservations sign no NMRS # $ 100 $ - Benches Metal benches (4) in front of restroom 14 1/2 Raise to 17-19" $ 250 $ 300 $ 300 99/00 Fountain Not accessible Install fountain and path of travel, frt of RR $ 3,000 $ 2,000 $ 2,000 99/00 $ 3,750 Restrooms Slope into restrooms too steep & 1" lip (12")Increase slope and eliminate lip $ 400 $ 100 $ 100 99/00 Restrooms Restrooms not at all accessible Completed reconfigure, accessible fixtures $ 6,000 $ 10,000 $ 10,000 99/00 $ 6,400 Jul-97 Tennis Courts Gate locks at 53 1/2" (10)Lower locks to 40-48" $ 20 $ 100 $ 100 99/00 Tennis Courts Entrance to Court 3, uneven Replace 7' x 5' concrete path $ 200 $ 130 $ 130 99/00 $ 220 Handball Courts Sidewalk to courts 42' L 20" rise Replace to 1:12, intermediate landing $ 3,200 $ 617 $ 617 99/00 $ 3,200 Sidewalks Surrouding NW curve at Picacho, sunk, cracked Replace 5' of concrete $ 150 $ 52 $ 52 99/00 Sidewalks Surrouding 3 ramps from picacho 19.4"- 16" rise Install 2 diagonal ramps 1:12 slops $ 7,680 $ 1,300 $ 1,300 99/00 Sidewalks Surrouding Between NW and Ctr ramp, sunk, cracked Replace 11' $ 270 $ 170 $ 170 99/00 Sidewalks Surrouding Ramp from Melendres too steep Replace 26' and achieve 1:12 slope $ 4,200 $ 403 $ 403 99/00 Sidewalks Surrouding Ramp @ Van Patten/Melendres uneven, steep Replace 48' concrete at 1:12 slope $ 7,700 $ 744 $ 744 99/00 Sidewalks Surrouding Evergreens along sidewalk encroach path Trim all evergreens $ - $ - 1998 $ 20,000 Signs Restrooms (2) $ 100 $ 183 $ 183 $ 100 Picnic Tables None accessible Modify 1 $ 600 $ 600 $ 600 99/00 $ 600 subtotal $ 34,270 Jul-97 contingency $ 3,427 TOTAL $ 37,697 $ 12,677 $ 4,416 $ - $ 17,093 roundup $ 38,000 *************************** *************************** * MEERSCHEIDT RECREATION CENTER Parking Power door turned off Keep on during business hours $ - $ - $ - Jul-97 Service counter 42 1/2"Lower 4' section to 28-34" $ 1,540 $ 800 $ 800 98/99 7-Jul Service counter Brochures mounted 29-64", blocked Provide clear space & mount < 54" $ - $ 75 $ 75 98/99 Game Room ER door blocked by table Clear ER exit $ - $ - $ - 97/98 Game Room ER exit to 5" step down install "not accessible" sign $ 40 $ 26 $ 26 97/98 Game Room No accessible tables Purchase 1 table w/o fixed chairs $ - $ 325 $ 325 98/99 $ 1,580 Front Women's RR Inappropriate sign Install sign on wall 60" AFF $ 36 $ 26 $ 26 97/98 Front Women's RR Sink 31" and 33 1/2, turn, UC Install accessible sink w/levers, cover pipes $ 520 $ 340 $ 340 97/98 Front Women's RR Mirrors 47 1/2 & 44"lower 1 to 40" above accessible sink $ 20 $ 10 $ 10 97/98 Front Women's RR Sanitary machine 53" at controls Lower so controls at 40-48" $ 30 $ 20 $ 20 97/98 Front Women's RR Stall 38x56 Reconfigure to 5x5 stall $ 2,064 $ 1,070 $ 1,070 97/98 Front Women's RR Stall door slip lock Level door, install loop handle $ 30 $ 30 $ 30 97/98 $ 2,700 Front Men's RR Inappropriate sign Install sign on wall 60" AFF $ 36 $ 26 $ 26 97/98 Front Men's RR Mirror at 43 1/2"Lower to 40" $ 20 $ 10 $ 10 97/98 Front Men's RR Sink 39", uncovered pipes Install accessible sink w levers, covered $ 520 $ 300 $ 300 97/98 Front Men's RR Soap and towels obstructed Relocate to unobstructed area @ 40-48" $ 20 $ 20 $ 20 97/98 Front Men's RR Stall 38x56 Reconfigure to 5x5 stall $ 2,064 $ 1,070 $ 1,070 97/98 Front Men's RR Stall door slip lock Level door, install loop handle $ 30 $ 30 $ 30 97/98 $ 2,690 Phone N-S Main Hall Protrudes 7", no amplification Install cane detectors, amplification $ 200 $ 120 $ 120 97/98 $ 200 West Center Gym Benches 20", 11 1/2" deep New bench w/ seat 17-19" $ 300 $ 300 $ 300 98/99 $ 300 South Foyer Fountain not accessible Install new fountain $ 2,100 $ 1,100 $ 1,100 98/99 South Foyer Door stop safety hazard entering men's shower Remove door top and install latch on wall $ 50 $ 26 $ 26 97/98 $ 2,150 Men's Shower Towel & Soap blocked by waste basket Move waste basket $ - $ - $ - 97/98 Men's Shower Open vanity 32", 23" knee height Remove vanity install lav's $ 1,100 $ 390 $ 390 97/98 Men's Shower No accessible stalls or showers Reconfigure to provide stall and shower $ 4,000 $ 5,000 $ 5,000 97/98 Men's Shower Changing room hangers too high Lower 4' section at mas of 48" $ 50 $ 20 $ 20 97/98 $ 5,150 Weight Room Posters mounted too high Mount centered at 60" AFF $ - $ - $ - 97/98 Weight Room Entrance blocked by positioning of equipment Reconfigure to provide 36" clear path $ - $ - $ - 97/98 $ - Basketball Large No integrated seating Review for solutions $ - Basketball Large SE ER Exit 3" drop w/ 4" metal bevel ramp Review for solutions $ - Basketball Large SW ER exit 3" drop Mark as inaccessible/provide assistance $ 36 $ 26 $ 26 97/98 $ 36 Women's RR South Ledge over mirror loose Remove - Do not replace $ - $ 20 $ 20 97/98 Women's RR South Mirror at 47 1/2"Lower to 40" $ 20 $ 50 $ 50 97/98 Women's RR South Sink 31" exposure Raise to 34", lever hdles, cover pipes $ 520 $ 340 $ 340 97/98 Women's RR South Soap and towels obstructed, Soap at 49"Relocate to unobstructed area $ 20 $ 70 $ 70 97/98 Women's RR South No accessible stall, shower or changing room Reconfigure $ 4,000 $ 5,000 $ 5,000 97/98 Women's RR South Clothes hangers to high Lower section to 48" maximum $ 50 $ 50 $ 50 97/98 Women's RR South ER exit from hall won't open $ - $ - $ - jul-97 $ 4,610 Men's RR South No accessible stall, shower or changing room Reconfigure $ 4,000 $ 5,000 $ 5,000 97/98 Men's RR South Sink 30 1/2", exposed pipes, turn ctrls Install accessible sink, levers, cover pipes $ 520 $ 300 $ 300 97/98 Men's RR South Urinal at 23 1/2"Mount at 17" $ 370 $ 370 $ 370 97/98 Men's RR South Dispensers at 50"Install at 40-48" in unobstructed area $ 30 $ 120 $ 120 97/98 Men's RR South Mirror at 40" blocked by wastebasket Remove obstruction $ - $ - $ - 97/98 Men's RR South Benches at 16"Install benches at 17-19" $ 580 $ 100 $ 100 98/99 Men's RR South ER door won't open from hallway Repair $ 5,500 $ - $ - Jul-97 Signage Needed throughout (15)Install 15 signs $ 540 $ 390 $ 390 97/98 Alarms Install audio/visual alarms (6) $ 1,050 $ 1,050 $ 1,050 97/98 $ 1,595 subtotal $ 26,511 contingency $ 2,651 Jun-97 TOTAL $ 29,162 $ 21,320 $ 2,700 $ - $ 24,020 roundup $ 30,000 *************************** *************************** * MESILLA PARK RECREATION CENTER (now Papen Community Center) Parking No signs to 2 spaces, no Van Access space Relocate parking and + van w/ sign @ corner $ 300 $ 250 $ 250 97/98 Entrance Redirect flow to new entrance Sign $ 100 $ 79 $ 79 97/98 Entrance Front ramp 18'L x 18' Rise no rails Relocate entrance $ 400 $ - $ - 97/98 Entrance Power door turned off Leave on at all times $ - $ - $ - Jul-97 Entrance New power door operator at new entrance $ 2,000 $ 1,200 $ 1,200 97/98 Entrance Front warning paint warn off Re-paint or block entrance $ 20 $ 10 $ 10 97/98 $ 2,820 Service Counter Front counter 42"Demolish and build new counter $ 300 $ 1,200 $ 1,200 98/99 Snack bar Counter 42"Lower section $ 1,700 $ 147 $ 147 98/99 Fountain Not cane detectable Relocate w/ new entrance, cane detectors $ 2,100 $ 120 $ 120 97/98 $ 4,100 Interior ramp No railings Install double railings $ 800 $ 170 $ 170 97/98 Interior Ramp Surface pulling away - hazard Install new raised disc surface $ 500 $ 100 $ 100 97/98 Interior Ramp pathway obstructed w/ chair racks Keep path clear $ - $ - $ - Jul-97 $ 1,300 Women's RR Door heavy Adjust to 5# $ - $ 20 $ 20 97/98 $ - Men's RR Urinal at 24"Lower to 17" $ 370 $ 370 $ 370 97/98 $ 370 NW Women's RR Door heavy Adjust to 5# $ - $ 20 $ 20 97/98 NW Men's RR Urinal at 24"Lower to 17" $ 370 $ 370 $ 370 97/98 $ 370 Senior area Ceramic sink not accessible Provide assistance as needed $ - $ - $ - 97/98 $ - Corridor No-So Doors propped open w/ chairs, boxes Doors must be closed when not in use $ - $ - $ - Jul-97 Corridor No-So Room 5 hardware has been replaced w/ turn Replace with lever $ 200 $ 200 $ 200 97/98 ER Exit Off main room = stairs Install sign marking inaccessible exit $ 72 $ 26 $ 26 97/98 Interior Courtyard Relocate entrance here Replace doors $ 6,000 $ 3,500 $ 3,500 97/98 Corridor No-So Fire extinguisher protrudes Move closer to corner pillar $ 80 $ 20 $ 20 98/99 Corridor No-So Wood floor, rise at edge or slope Insert wood/synthetic beveled edge $ 100 $ 40 $ 40 97/98 NW ER Exit Stairs (adjacent to senior area0 Install modular ramp $ 5,500 $ 5,500 $ 5,500 97/98 $ 11,952 subtotal $ 20,912 contingency $ 2,091 TOTAL $ 23,003 $ 11,975 $ 1,367 $ - $ 13,342 roundup $ 24,000 *************************** *************************** * MUNSON CENTER Parking Limited signage for accessible spaces Add 10 signs $ 1,000 $ 915 $ 915 97/98 So Parking Lot No signage Install 8 signs $ 800 $ 732 $ 732 97/98 No Parking Lot Curb access Remove/replace 200 SF sidewalk to 50:1 $ 3,200 $ 1,730 $ 1,730 98/99 $ 5,000 No Entrance No directional signage to access entrance Install directional sign $ 100 $ 92 $ 92 97/98 No Entrance Door hdwr not operational closed fist Install loop handle $ 200 $ 45 $ 45 97/98 Main Entrance Telephone @ service counter 58" @ ctrls Lower phone to max 48" at controls $ 200 $ 70 $ 70 98/99 Main Entrance Telephone amplification?Make sure phone meets hearing aid reqmts $ - $ - $ 500 Service Counter Counter 41" with glass Remodel, lower section 28-34" $ 700 $ 1,200 $ 1,200 98/99 Sign-in Counter 42.5"Lower section or provide sign-in table 28-34 $ 750 $ 200 $ 200 98/99 $ 1,450 Exterior Phone Have US West install accessible unit $ 200 Need Price 98/99 $ 200 So Men's RRoom Toilet 15"Raise to 17-19" $ 450 $ 250 $ 250 97/98 So Men's RRoom TP Dispenser above grab bar Move below and 12" in front of toilet $ 10 $ 10 $ 10 97/98 So Men's RRoom 1 horizontal grab on side Install second back grab $ 70 $ 50 $ 50 97/98 So Men's RRoom Mirror 47.5"Lower to 40" $ 20 $ 20 $ 20 97/98 So Men's RRoom Sign Mount on wall at 60" AFF $ 36 $ 10 $ 10 97/98 $ 586 So Women's RRoom Toilet 15"Raise to 17-19" $ 450 $ 250 $ 250 97/98 So Women's RRoom TP Dispenser above grab bar Move below and 12" in front of toilet $ 10 $ 10 $ 10 97/98 So Women's RRoom 1 horizontal grab on side Install second back grab $ 70 $ 50 $ 50 97/98 So Women's RRoom Mirror 47.5"Lower to 40" $ 20 $ 20 $ 20 97/98 So Women's RRoom Sign Mount on wall at 60" AFF $ 36 $ 10 $ 10 97/98 So Women's RRoom Sink exposed pipes Cover pipes $ 50 $ 50 $ 50 97/98 $ 636 Staging Area No ramp to stage Can alter programming $ 3,700 $ 7,300 $ 7,300 98/99 Pool Area Fountain not cane detectable Place plant north of fountain $ 160 $ - $ - 97/98 Ceramics Area Tables 30" H, 24" knee Purchase 1 table 28-34" w/ 29" knee $ - $ 325 $ 325 98/99 Ceramics ARea 2 sinks not accessilbe Install 1 accessible sink $ 360 $ 220 $ 220 98/99 Ceramics Area Hallway obstructed with boxes Keep path of travel clear $ - $ - $ - Jun-97 Snack Bar Counter > 42" high Lower section of counter $ 460 $ 100 $ 100 98/99 Lapidary Area Counters not accessible Lower 1 section of machine station $ 1,000 $ 90 98/99 $ 5,680 No Women's RR Sink - exposed pipes Cover pipes $ 50 $ 50 $ 50 97/98 No Women's RR Towel dispenser 48.5"Lower to 40-48" $ 10 $ 10 $ 10 97/98 No Women's RR TP dispenser above bar at 39.5"mount below grab 12" in front of toilet $ 10 $ 10 $ 10 97/98 No Women's RR Stall - turn handle Change to lever style $ 30 $ 50 $ 50 97/98 No Women's RR Main entry heavy door Adjust door pressure to 5# $ - $ 20 $ 20 97/98 No Women's RR Main entry narrow loop Install wider door loop $ 200 $ 45 $ 45 97/98 $ 300 No Men's RR Urinal at 24" and 18.5"Lower one to 17" $ 370 $ 370 $ 370 97/98 No Men's RR Sink - exposed pipes Cover pipes $ 50 $ 50 $ 50 97/98 No Men's RR Towel dispenser 48.5 Lower to 40-48" $ 10 $ 10 $ 10 97/98 No Men's RR Exit sign at 58.5 Center 60" AFF $ 36 $ 10 $ 10 97/98 No Men's RR TP dispenser above grab bar Mount below and 12" in front of toilet $ 10 $ 10 $ 10 97/98 No Men's RR Stall handle turn Change to lever style lockset $ 30 $ 50 $ 50 97/98 No Men's RR Main entry door heavy Adjust door to 5# $ - $ 20 $ 20 97/98 No Men's RR Main entry narrow loop Install wider door loop $ 200 $ 20 $ 20 97/98 $ 706 No Hall Fountain Protrudes 9.5, not detectable Install cane detectors $ 160 $ 50 $ 50 97/98 $ 160 So Companion Prog Exterior sidewalk 1/2" lip on sunken slab Install 6'x4 slab $ 300 $ 500 $ 500 97/98 $ 300 subtotal $ 15,518 contingency $ 1,551 TOTAL $ 17,069 $ 3,789 $ 3,935 $ 7,300 $ 15,024 roundup $ 17,500 *************************** *************************** * POLICE DEPARTMENT Parking 2 designated spaces no signs Install 1 car, 1 Van sign $ 200 $ 183 $ 183 98/99 $ 200 Entrance Power door Operational $ - $ - $ - 98/99 Entrance Double door, single opening 30 1/2"Replace 2 1/2" push bar with flush bar $ 200 Need Price 98/99 Entrance Trash and ashtray block path of travel Move to east wall beyond path of travel $ - $ - $ - Oct-97 $ 200 Vestibule ER Telephone controls 54-56"Lower so controls at mas of 48" $ 200 $ 70 $ 70 98/99 No Department TTY Purchase TTY $ - $ 499 $ 499 98/99 Vestibule No TTY for ER services Install public TTY for ER services $ 2,000 $ 699 $ 699 98/99 $ 2,200 Lobby Front Counter/Glass at 43 3/4"Lower 4' section to 28-34" $ 5,100 $ 1,200 $ 1,200 98/99 Lobby Accident report counter 41 3/4"Lower to 28-34" $ 2,000 $ 1,200 $ 1,200 98/99 Lobby Public phone controls at 54-62"Lower phone so controls at max of 48" $ 200 $ 70 $ 70 98/99 Lobby Pamphlet racks on top of table 48-68" reach Purchase floor rack, max reach 48" $ - $ 100 $ 100 98/99 $ 7,300 Public Restrooms Both $ - Restrooms Entry doors - turn hardware Change to lever locksets (2) $ 400 $ 400 $ 400 98/99 Restrooms Stall door - turn handle Install lever locks and loop exterior handle $ 60 $ 100 $ 100 98/99 Restrooms Layout does not allow side transfer Consider reconfiguration, Plenty of room $ 2,000 $ 1,500 $ 1,500 98/99 $ 2,460 Interview Restrooms Entry door, turn knob Replace with lever (1) lockset $ 200 $ 200 $ 200 98/99 Interview Restrooms Sink 33 1/2, levers, uncovered pipes Cover pipes $ 50 $ 50 $ 50 98/99 Interview Restrooms 14" between sink and toilet - no transfer space Reconfigure $ - $ 800 $ 800 98/99 $ 250 Interview Rooms Turn handles Replace when necessary(5) $ 1,000 $ 1,000 $ 1,000 98/99 Interview Rooms Tables 29" high, 24" knee clearance Equip 1 room with 34" high 27" knee table $ - $ 325 $ 325 98/99 $ 1,000 Holding Cells RR 35 1/2" sink, push controls Lower to 34" $ 300 $ 200 $ 200 98/99 Holding Cells RR Toilet 18", 0 grab bars Install 2 grab bars $ 140 $ 100 $ 100 98/99 $ 440 Sally Port 3 3/4" step up to holding area entrance Install curb cut. $ 2,150 $ 70 $ 70 98/99 $ 2,150 Restrooms Other Locked - Evaluate $ 1,000 $ 1,000 subtotal $ 17,200 contingency $ 1,720 TOTAL $ 18,920 $ 7,566 $ 1,200 $ - $ 8,766 roundup $ 19,000 *************************** *************************** * TRANSIT BUILDING Parking No sign to indicate accessible west entrance Install street sign $ 100 $ 92 $ 92 99/00 Parking 1 space, no indicated acess aisle X=132"Install Van Accessible Sign $ 100 $ 92 $ 92 99/00 $ 200 Entrance Ramp 16'3" L x 12" rise, Rails 36"OK $ - $ - $ - 99/00 Entrance Door - very heavy (33" wide)Can door be adjusted??? $ 300 $ - 99/00 Entrance Loop & lock need to be operated to open Install new lockset $ 200 $ 200 $ 200 99/00 Entrance 3/4" threshold Replace threshold $ 100 $ 50 $ 50 99/00 $ 600 Front Counter 47 1/2"Lower 4' to 28-34" $ 720 $ 1,200 $ 1,200 99/00 $ 720 Restrooms-Both Turn hardware on entry door 33" (2)Install lever hardware and lockset $ 400 $ 400 $ 400 99/00 Restrooms-Both Small inaccessible sinks (2)Install accessible sinks, levers, cover pipes $ 820 $ 600 $ 600 99/00 Restrooms-Both Soap dispensers at 52" - Women's 1 not wrking Lower to 40-48" $ 40 $ 20 $ 20 99/00 Restrooms-Both Size 80x54 Not possible to have 5x5 $ - $ - Restrooms-Both Toilets at 20"Lower to 17-19" $ 1,060 $ 100 $ 100 99/00 Restrooms-Both No compliant signs Install compliant signs on wall 60 AFF $ 80 $ 52 $ 52 99/00 $ 2,400 Transit Garage Restroom 1st floor not accessible - tub sink.Remove access sign $ 10 $ 10 $ 10 99/00 Transit Garage Shower not accessible Employee use only. $ - $ - $ - 99/00 $ 10 subtotal $ 3,930 contingency $ 393 TOTAL $ 4,323 $ 2,815 $ - $ - $ 2,815 roundup $ 4,500 *************************** *************************** * UTILITIES Parking 5 parking spaces - 0 signs Install 5 signs $ 500 $ 458 $ 458 99/00 $ 500 Main Restrooms Both $ - 99/00 Restrooms Both Sink 33" covered pipes, single push/pull ctrl Change to lever controls (2) $ 150 $ 140 $ 140 99/00 Restrooms Both Mirror 50 1/2"Lower to 40" (2) $ 50 $ 40 $ 40 99/00 Restrooms Both Towels at 51"Lower to 40-48" (2) $ 30 $ 20 $ 20 99/00 Restrooms Both 2 stalls 119x47 Reconfigure to provide 5x5 stall (2) $ 3,600 $ 800 $ 800 99/00 $ 3,830 Womens' Restroom Path of travel obstructed by table Remove table $ - $ - $ - 1997 Womens' Restroom Path of entry to larger stall, locker obstruction Remove lockers $ 50 $ - $ - 1997 Women's Restroom Sanitary products at 53" @ controls & protrudes Lower to 48" at controls and relocate $ 30 $ 20 $ 20 99/00 $ 80 Men's Restroom Urinal at 23"Lower to 17" $ 370 $ 370 $ 370 99/00 $ 370 Main Halls Fire extinguishers protrude 5 1/2"Relocate (5) $ 400 $ 50 $ 50 99/00 $ 400 Back restrooms Locked - Evaluate $ 1,000 $ 1,000 Office doors Turn handles When malfunction, replace w/ levers $ 2,000 $ 2,000 subtotal $ 8,180 contingency $ 818 TOTAL $ 8,998 $ 1,898 $ - $ - $ 1,898 roundup $ 9,000 *************************** *************************** * YOUNG PARK Parking No identified van parking Install 1 sign for van $ 100 $ 92 $ 92 97/98 Path of travel Asphalt ramp to sidewalk from parking lot Remove aslphalt install curb cut. $ 2,800 $ 150 $ 150 97/98 Signs No directional signs Install signs for parking, restrooms, fountains $ 300 $ 915 $ 915 97/98 Access No access from Colorao and Baco Install 1:12 ramp $ 2,800 $ 5,000 $ 5,000 98/99 Path of travel To path to tennis court pave path of travel $ 2,700 $ 250 $ 250 98/99 $ 8,700 Picnic Tables None accessible Purchase 3 accessible tables $ 2,000 $ 1,800 $ 1,800 98/99 Bridge Ramp over NE pond 10'L 20" high Increase length of ramp to lessen slope $ 3,000 $ 1,900 $ 1,900 97/98 $ 5,000 Drinking fountain NE Side of pond 31" high, low flow Increase water flow $ - $ 20 $ 20 97/98 Drinking fountain SE 35" high 37" at spout Decrease water flow $ - $ 20 $ 20 97/98 Drinking fountain By restrooms, 35" high 37" at spout OK $ - $ - $ - 97/98 $ - Women's RRoom Entrance slope steep 4" Hx 9" long Extend ramp to lessen slope $ 200 $ 1,000 $ 1,000 97/98 Women's RRoom No grab bars Install 2 grab bars $ 140 $ 100 $ 100 97/98 Women's RRoom Stall 52x96 Reconfigure to 5x5 $ 1,800 $ 220 $ 220 97/98 Women's RRoom Stall door, slide lock Install new lever $ 30 $ 30 $ 30 97/98 Women's RRoom Sink exposed pipes Cover pipes $ 50 $ 50 $ 50 97/98 Women's RRoom No dispensers Install soap and towel dispensers $ 150 $ 100 $ 100 97/98 Women's RRoom No waste container Install waste container $ 50 $ 190 $ 190 97/98 $ 2,420 Men's RRoom Entrance slope steep 4" Hx 9" long Extend ramp to lessen slope $ 200 $ 1,000 $ 1,000 97/98 Men's RRoom No grab bars Install 2 grab bars $ 140 $ 100 $ 100 97/98 Men's RRoom Stall 52x96 Reconfigure to 5x5 $ 1,800 $ 220 $ 220 97/98 Men's RRoom Stall door, slide lock Install new lever $ 30 $ 30 $ 30 97/98 Men's RRoom Sink exposed pipes Cover pipes $ 50 $ 50 $ 50 97/98 Men's RRoom Sink - turn controls Install lever controls $ 70 $ 70 $ 70 97/98 Men's RRoom No dispensers Install soap and towel dispensers $ 150 $ 100 $ 100 97/98 Men's RRoom No waste container Install waste container $ 50 $ 190 $ 190 97/98 Men's RRoom Urinal at 28"Lower to 17" $ 370 $ 370 $ 370 97/98 Men's RRoom Entry door handle missing Install loop handle $ 200 $ 45 $ 45 97/98 $ 3,060 Playgrounds Review new guidelines subtotal $ 19,180 contingency $ 1,918 TOTAL $ 21,098 $ 6,962 $ 7,050 $ - $ 14,012 roundup $ 21,100 *************************** *************************** * Apodaca Stadium Parking No designated parking Designate, stripe, sign 2 spaces 1 car/1van $ 300 Parking Curb cut at traffic corner and asphalt Install curb cut w/ access aisle of 2 new spaces @ sidewalk $ 700 $ 1,000 Entrance/Gate Surface inside gate is not level Level surface inside gate area-raise area to reduce ramp slope $ 150 Entrance/Gate ramped surface fr gate too steep-6.8 to 9.1%Reduce slope of ramp & install landings $ 3,250 Entrance/Gate Ramped surface 40' long - no landings Level landings every 30 feet $ 3,700 Entrance/Gate No handrails on initial ramped surface Install handrails both sides when remodeling ramp $ 700 $ 7,800 Upper Ramp Single handrails at 36"Install handrails both sides $ 700 $ 700 Drinking Fountain Clear floor space is not level Install accessible fountain at junction $ 3,000 Drinking Fountain Turn controls between gate entrance and path to $ - Drinking Fountain Spout at 34"the restrooms & place diretional sign at $ 100 Drinking Fountain Front approach possible - not side approach old fountain $ - $ 3,100 Path of Travel Dirt path from gate to restrooms, uneven Asphalt path to restrooms & concessions $ 800 $ 800 Restrooms LOCKED $ 7,000 $ 7,000 Concessions West side at 37 1/2" high Lower section of window to 34" $ 700 Concessions East side at 40" high Lower section of window to 34" $ 700 $ 1,400 Seating Limited integrated seating - one section in sun Remove cross bars for boxes $ 400 Seating Step up to second tier of seats out of sun Ramp to second tier for seating $ 2,400 $ 2,800 subtotal $ 24,600 contingency $ 2,460 TOTAL $ 27,060 $ - $ - $ - $ - roundup $ 27,000 *************************** *************************** * WIA Building Parking No designated parking Designate 1 space w/ sign on street by drive pad $ 100 $ 100 Ramp Slope varies 8.0/8.8/8.7/9.5 Length: 33 ft Redesign,level slope, intermediate landing $ 12,000 Ramp Handrails both sides at 41-3/4"Install new handrails at 34-36", extend 12" top and bottom $ - $ 12,000 Entrance 2" step up into door Install 4" beveled surface $ 120 Entry Door Dbl doors with small loop handles Install larger loop handles both doors $ 400 $ 520 Restroom 47"x x 65" long. Relocate unisex RR to adjacent bedroom-all new compliant fixtures and controls $ 7,000 Restroom install sign $ 36 $ 7,036 Bedroom Door 25" with 90 degree door open Widen door to 32" clear space $ 450 Kitchen Door 27" wide Widen door to 32" clear space $ 450 Kitchen Pass thru window into kitchen 38"If remains: lower to 34-36" $ 1,200 North Room Door 25" wide with 90 degree door open Widen door to 32" clear space $ 450 Kitchen Not accessible Make accessible counters and cabinets $ 5,600 $ 8,150 Alarms No visual alarms Install 4 visual alarms $ 700 $ 700 Edging Exterior Edging surrounds lawn areas Remove section of edging adjacent to ramp $ 200 $ 200 Hardware All door hardware is turn controls Replace with levers (3 sets) $ 600 $ 600 ER Exit No emergency exit Modular/permanent ramp off back door $ 5,500 $ 5,500 subtotal $ 34,806 contingency $ 3,480 TOTAL $ 38,286 roundup $ 38,500 *************************** *************************** * EAST HADLEY FACILITIES HARTY T-BALL FIELDS Parking 3 accessible parking spaces 0 signs install 3 signs $ 300 $ 275 $ 275 99/00 $ 300 Playground Review playground accessibility specs $ - $ - $ - Women's RRoom Sink - exposed pipes Cover pipes $ 50 $ 50 $ 50 99/00 Women's RRoom Stall handle too small Install wider loop handle $ 30 $ 50 $ 50 99/00 Women's RRoom Mirror obstructed by trash container Move trash - get rectangular to take < room $ - x 97 $ 80 Men's RRoom Sink - exposed pipes Cover pipes $ 50 $ 20 $ 20 99/00 Men's RRoom Stall handle too small Install wider loop handle $ 30 $ 45 $ 45 99/00 $ 80 subtotal $ 460 contingency $ 46 TOTAL $ 506 $ 440 $ - $ - $ 440 roundup $ 600 *************************** *************************** * HARTY BALLPARK Parking 104 parking, 2 signated, pitted Repave parking for 4+1 van $ 5,700 $ 4,000 $ 4,000 99/00 Parking Poor path, steep ramp 10" cut & dirt lower 1/3 Lengthen ramp, smooth out, fill dirt area $ 500 $ 300 $ 300 99/00 Sidewalk At front & to Meerscheidt covered w/ rock Maintain clean path of travel $ - X 1997 Path of Travel No path to any of 3 diamonds Pave path to each diamond 20' $ 9,600 $ 150 $ 150 99/00 Diamonds No even seating area Pave level surface 10'x10 adjoining bleachers (3) $ 6,400 $ 186 $ 186 99/00 $ 22,200 Concessions Window counters 42 1/2 on 3 stands Lower 4' section to 28-34" * 3 $ 300 $ 119 $ 119 99/00 Drinking fountain Not accessible, turn hdls, spout 38" ctrd 12" deep sink Install 2 level accessible fountains $ 3,000 $ 6,000 $ 6,000 99/00 Women's RRoom Entry turn handles Replace w/ levers $ 200 $ 200 $ 200 99/00 Women's RRoom 33", UC pipes, 1 lever missing Install new accessible sink, cover, levers $ 620 $ 600 $ 600 99/00 Women's RRoom 25" stall door, alternate stall Reconfigure for 5x5 stall, enlarge door $ 1,800 $ 1,000 $ 1,000 99/00 Women's RRoom Toilet 20"New toilet 17-19" $ 460 $ 370 $ 370 99/00 Women's RRoom Stall no door handle Install loop handle and lever lock $ 30 $ 75 $ 75 99/00 Women's RRoom Old ashtray protrudes in entry hall Remove ashtray $ 20 $ 10 $ 10 99/00 Women's RRoom Dryer controls at 47"Lower to 40-44" at controls $ 70 $ 20 $ 20 99/00 $ 3,200 Men's RRoom Entry door turn hardware Replace w/ levers $ 200 $ 200 $ 200 99/00 Men's RRoom Sink 32 1/2", UC pipes, 1 lever missing Install new accessible sink, cover, levers $ 620 $ 600 $ 600 99/00 Men's RRoom Stall odd shape Reconfigure to 5x5 stall, enlarge door $ 1,800 $ 1,000 $ 1,000 99/00 Men's RRoom Toilet at 20:New toilet 17-19" $ 460 $ 370 $ 370 99/00 Men's RRoom Stall door, no handle, lever lock Install loop handle and larger lever lock $ 30 $ 75 $ 75 99/00 Men's RRoom Urinal 24", controls 53"Lower to 17", ctrls 48" max $ 370 $ 370 $ 370 99/00 Men's RRoom Old ashtray protrudes in entry hall Remove ashtray $ 20 $ 10 $ 10 99/00 Men's RRoom Dryer controls at 47"Lower to 40-44" at controls $ 70 $ 20 $ 20 99/00 $ 3,570 Signs None Install signs at restrooms (2 @ 52) $ 72 $ 104 $ 104 99/00 $ 72 subtotal $ 29,042 contingency $ 2,904 TOTAL $ 31,946 $ 9,779 $ 6,000 $ - $ 15,779 roundup $ 32,000 *************************** *************************** * MAAG BASEBALL PARK Parking 1 space w/ sign, no stripping Stripe for 5 w/ 1 Van and install 3 signs $ 350 $ 303 $ 303 98/99 $ 350 Concession Along entry 49" counter Lower 4' section to 28-34" $ 200 $ 145 $ 145 98/99 Diamond Areas No path to SE and NW diamonds Pavr 100' path to 2 bleacher areas $ 1,000 $ 1,600 $ 1,600 98/99 Concession Bldg Counter 36" (concrete)Lower 4' section 28-34" $ 300 $ 300 $ 300 98/99 Concession Bldg Swamp cooler protrudes bldg NE side Place enclosure a/r cooler $ 200 $ 250 $ 250 98/99 Fountain Free standing, on slab 32" @ spout, Turn ctrls Install accessible fountain $ 3,000 $ 2,000 $ 2,000 98/99 $ 4,700 Women's RR Entry door, small loop at 55"Install wider loop at 40-48" $ 200 $ 45 $ 45 98/99 Women's RR Mirror at 41 1/2"Lower to 40" $ 20 $ 20 $ 20 98/99 Women's RR Towels at 56 1/2"Lower to 40-48" $ 10 $ 20 $ 20 98/99 Women's RR Stall 56x57, small lock, no ext handle Install lever lock and loop handle $ 40 $ 30 $ 30 98/99 Women's RR Stall 56x57 Reconfigure to 5x5 $ 2,150 $ 770 $ 770 98/99 Women's RR Stall, no grab bars Install grab bars $ 70 $ 45 $ 45 98/99 Women's RR Stall, TP dispenser too high Mount below grab bars $ 10 $ 10 $ 10 98/99 Women's RR Toilet 20"New toilet at 17-19" $ 500 $ 100 $ 100 98/99 $ 3,000 Men's Room Stall 41x60, small lock no handle Reconfigure to 5x5 w/ hardware $ 2,150 $ 770 $ 770 98/99 Men's Room Stall, no grab bars Install grab bars $ 70 $ 45 $ 45 98/99 Men's Room Stall, TP dispenser too high Mount below grab bars $ 10 $ 10 $ 10 98/99 Men's Room Toilet 20"New toilet at 17-19" $ 500 $ 100 $ 100 98/99 Men's Room Urinal at 26"Lower to 17" $ 370 $ 370 $ 370 98/99 Men's Room Waste receptacle located in entry hall Move out of path of travel $ - x 1997 $ 3,100 Restrooms General No accessible stall Explore unisex option ($25,000) $ - $ 25,000 $ 25,000 98/99 $ - Signs Restrooms signs $ 100 $ 52 $ 52 98/99 $ 100 subtotal $ 11,250 contingency $ 1,125 TOTAL $ 12,375 $ 29,638 $ 2,295 $ - $ 31,933 roundup $ 13,000 *************************** *************************** * PAZ BALLPARK Parking 5 spaces, 0 van, poor surface & access Repave area for 4+1 Van - 54' $ 1,200 ??? 98/99 Parking 2 signs for 6 spaces Install 4 signs $ 400 $ 366 $ 366 98/99 $ 1,600 Path or Travel Path to park 68'L 47" W no rails Grade, install landing, repave ramp, rails $ 17,000 $ 10,000 May be low dependin g on amt of grading 98/99 Path of Travel Path fr ramp to diamonds pitted, 1 1/2" lip Resurface for smooth path $ 3,000 In above 98/99 $ 20,000 Picnic Area Picnic tables, 7, 2 have end access (bro tbls)Rearrange to allow wheelchair access $ - $ - $ - 98/99 Diamond areas No level seating or path to NE & NW diamonds Pave path or travel and 6x10' level seating $ 4,800 $ 262 $ 262 98/99 $ 4,800 Concession Counter at 44"Lower seciton to 28-34" $ 500 $ 145 $ 145 98/99 Water spigot East of building, just within cane detection OK $ - $ - $ - Drinking Fountain No accessible Install accessible fountain $ 3,000 $ 2,000 $ 2,000 98/99 $ 3,500 Women's RRoom Sink 31", lever controls, covered pipes Raise sink to 33" $ 300 $ 200 $ 200 98/99 Women's RRoom Towels at 50"Lower 40-48: $ 10 $ 20 $ 20 98/99 Women's RRoom No accessible stall Reconfigure to provide 5x5 stall $ 2,000 $ 2,500 $ 2,500 98/99 $ 2,310 Men's RRoom Sink 31", lever controls, covered pipes Raise sink to 33" $ 300 $ 200 $ 200 98/99 Men's RRoom Towels at 50"Lower 40-48: $ 10 $ 20 $ 20 98/99 Men's RRoom No accessible stall Reconfigure to provide 5x5 stall $ 2,000 $ 2,500 $ 2,500 98/99 Men's RRoom Urinal at 24"Lower to 17" $ 370 $ 370 $ 370 98/99 Men's RRoom Soap dispenser at 35" broken Install new dispenser 40-48" $ 80 $ 57 $ 57 98/99 $ 2,760 subtotal $ 34,970 contingency $ 3,497 TOTAL $ 38,467 $ 18,640 $ - $ - $ 18,640 roundup $ 39,000 *************************** *************************** * BMX Track Parking No even surface, no striping or signs Level surface at front of RR structure $ 300 Parking parking Pave level surface $ 500 Parking parking Stripe for 1 car & 1 van, install signage $ 200 Parking parking Cut ramp handrail and level sidewalk $ 100 Parking parking surface transition from parking to sidewalk $ 450 $ 1,550 Ramp West Side 36 feet + 15' asphalt continuation ramp, Resolve when addressing parking (above) $ 10,000 no landing, 2" asphalt lip at base connecting point Ramp West Side Handrail 1 side Install second handrail $ - Path to Ramp No path from track to ramp to restrooms Pave 29 feet of sidewalk with landing connecting to existing sidwalk ramp $ 500 Ramp East Side 29 feet, rail on 1 side, asphalt lip at base Pave/stripe/sign level parking area adjacent to ramp $ 10,000 Ramp East Side Reduce lip at base of ramp $ - Ramp East Side Install second handrail $ - $ 20,500 Restrooms - Same as T- Ball Field Women's RRoom Sink - exposed pipes Cover pipes $ 50 $ 50 $ 50 Women's RRoom Stall handle too small Install wider loop handle $ 30 $ 50 $ 50 Women's RRoom Mirror obstructed by trash container Move trash - get rectangular to take < room $ - x Men's RRoom Sink - exposed pipes Cover pipes $ 50 $ 20 $ 20 Men's RRoom Stall handle too small Install wider loop handle $ 30 $ 45 $ 45 Restroom Slab Exposed edges without protection Install edge protection or backfill with soil $ 125 $ 285 subtotal $ 22,335 contingency $ 2,233 TOTAL $ 24,568 $ 165 $ - $ - $ 165 roundup $ 25,000 *************************** *************************** * PROPERTIES NO LONGER IN SERVICE CLUB FUSION (property sold) Parking 9 spaces; no signs, no van designation Install 8 + 1 van access signs (91.50/ea) $ 920 $ 824 $ 824 98/99 $ 920 Ramp 18' long, 7" rise, no handrails Install handrails at 36" $ 800 $ 800 $ 800 98/99 $ 800 Restroom's Both Frt Door pull 9#Adjust to 5# $ - $ - $ - Jul-97 Jul-97 $ - Telephone Controls at 50-52", 11" protrusion Lower to 48", cane detectors $ 200 $ 70 $ 70 98/99 $ 200 Dance Hall Bar 45 1/2" high Lower section to 28-34" $ 300 $ 300 $ 300 98/99 Dance Hall No ramp to stage Not required $ - $ - 98/99 Dance Hall ER exits to sidewalk & ramp no access away Cut curb at west corner $ 250 $ 250 $ 250 98/99 $ 550 Women's RR, Back Toilet seat cover mounted above grab bar Relocate under grab bar $ 40 $ 10 $ 10 98/99 $ 40 Men's restroom Waste container in front of towel dispenser Relocate away from access to towels $ - $ - $ - Jul-97 Jul-97 $ - Notice Strobes at 10 second intervals Post notice to advise public $ 72 $ - $ - Jul-97 Jul-97 DJ Loft Not accessible $ - $ - $ 72 *****NOTE Second half of building not renovated or used $ - $ - subtotal $ 2,582 contingency $ 258 TOTAL $ 2,840 $ 1,884 $ 370 $ - $ 2,254 roundup $ 2,900 *************************** *************************** * CITY OFFICE CENTER (property sold) Parking No directional signage Install signage indicating entrance $ 200 $ 92 $ 92 97/98 Main Entrance Loop handles @ 32 & 38" too small Install wider loop handles at 48" both doors $ 150 $ 90 $ 90 97/98 $ 350 Lobby Pay phone controls at 49-52"Lower phone so controls at 48" max $ 200 $ 70 $ 70 97/98 Lobby No TTY Install sign indicating TTY in Planning $ 36 $ 26 $ 26 97/98 Lobby Vending controls too high Contact vendors to install accessible $ - $ 236 $ - Men's RR 1st Floor OK $ - $ - $ - Men's RR 1st Floor Accessible stall 58" x 94"Reconfigure to 60" wide minimum $ 620 Need Price 97/98 Men's RR 1st Floor Uncovered pipes on sink Cover pipes $ 100 $ 100 $ 100 97/98 Men's RR 1st Floor Towels at 53 1/2"Lower to 40-48" $ 10 $ 10 $ 10 97/98 Men's RR 1st Floor Urinal at 23 1/2"Lower to 17" $ 370 $ 370 $ 370 97/98 $ 1,100 Women's RR 1st Flr No maneuvering room along side door Reconfigure room to allow maneuvering room $ 620 $ 800 $ 800 97/98 Women's RR 1st Flr Accessible stall 58" x 94"Reconfigure to 60" wide minimum $ - $ 1,020 $ 1,020 97/98 Women's RR 1st Flr Uncovered pipes on sink Cover pipes $ 100 $ 100 $ 100 97/98 Women's RR 1st Flr Towels at 53 1/2"Lower to 40-48" $ 10 $ 10 $ 10 97/98 Women's RR 1st Flr Seat cover dispenser at 48" above grab Locate below grab bar $ 10 $ 10 $ 10 97/98 Women's RR 1st Flr Sanitary dispenser controls blocked by waste Move waste container to allow access $ - $ - $ - Sep-97 $ 740 No/So 1st Flr Hall Fire extinguisher by elevator protrudes Relocate by raceway -eliminate protrusion $ 80 $ 80 $ 80 97/98 No/So 1st Flr Hall Dble doors (EAP/RM/HR) limit access Remove doors to provide clear access $ 280 $ 100 $ 100 97/98 No/So 1st Flr Hall Risk Management hall counter too high/protrudes Remove counter $ - $ - $ - Jul-97 Jul-97 $ 360 Elevator ER intercom push buttons (working?)Check operation. Install instructions $ 2,600 $ 26 $ 26 97/98 Elevator No visible/audible indicators Install indicators $ 800 $ 200 $ 200 97/98 Elevator Sign mounted too low Center on wall at 60" $ 10 $ 10 $ 10 97/98 $ 3,500 Human Resources Door too heavy, 31" clearance Replace door to widen opening $ 1,000 $ 600 $ 600 97/98 Human Resources Counter at 36"Lower to 28-34" $ 50 $ - $ - Sep-97 Sep-97 Human Resources Sofa obstructs path of travel Remove sofa $ - $ - $ - Oct-97 Human Resources Stools at counter area 27 1/2" high Remove stools, use chairs $ - Cost for 2 chairs? Human Resources 1/2 door to offices at 42"Replace door to have 28-34" counter $ 450 $ 500 $ 500 97/98 $ 1,500 Planning/Permits Door 31 1/2"Replace hardware to increase opening $ 200 $ 200 $ 200 97/98 Planning/Permits Inspectors office door too narrow Replace w/ glass door (ie. Arch Office) $ 2,000 $ 2,000 $ 2,000 97/98 Planning/Permits No signage Install appropriate signs (3) $ 108 $ 78 Already estimated in signage project? 97/98 Planning/Permits TTY Sign Install TTY sign $ 36 $ 26 $ 26 97/98 Planning/Permits Room 141 electrical panel protrudes 5"Install raceway to floor $ 85 $ 80 $ 80 97/98 Planning/Permits Fire extinguisher protrudes Move extinguisher $ 75 $ 80 $ 80 97/98 $ 2,504 Technical Support Entrance too narrow with center post Install glass door (I.e. Arch Office) $ 1,500 $ 2,000 $ 2,000 98/99 $ 1,500 Second Floor South Conf Room swinging doors Install glass door (I.e. Arch Office) $ 2,000 $ 2,000 $ 2,000 98/99 $ 2,000 2nd Restrooms Not accessible Install directional signs to 1st floor (2) $ 72 $ 52 $ 52 97/98 $ 72 2nd Fountain Not accessible Install accessible fountain $ 2,100 $ 1,100 $ 1,100 98/99 $ 2,100 Rear Entrance East Van accessible sign missing Install sign $ 100 $ 100 $ 100 97/98 $ 100 1st Floor Lounge Counter and sink not accessible Install accessible counter/sink $ 540 $ 240 $ 240 99/00 NE Exit door Turn hardware, door too heavy Lever hardware and adjust closure $ 300 $ 200 $ 200 97/98 NE Exit door No directional signage Install directional sign to accessible entrance $ - $ 200 $ 200 97/98 $ 840 Smoking room Turn hardware Install lever hardware $ 200 $ 200 $ 200 99/00 $ 200 Alarms Install 6 visible alarms $ 1,050 $ 1,050 $ 1,050 97/98 $ 1,050 North entrance 32" door opening into 63" vestibule Provide directional signs to front entrance $ - $ 200 $ 200 97/98 North entrance 32" door opening into 63" vestibule Reconfigure doors/vestibule $ 2,000 $ 1,450 $ 1,450 99/00 $ 2,000 Basement Steep ramp down from elevator Develop ramp w/ railings $ 6,200 $ 3,400 $ 3,400 97/98 Basement Restrooms not accessible Not in Use - Mark and lock $ 72 $ 6,272 subtotal $ 26,424 contingency $ 2,642 TOTAL $ 29,066 $ 11,880 $ 5,100 $ 1,890 $ 18,870 roundup $ 29,000 *************************** *************************** * CITY HALL (property sold) North Parking Inadequate signs (1 for 3 spaces)Install 1 additional sign $ 92 $ 92 $ 92 97/98 North Entrance Power door needs to open 33"Adjust door opener $ - $ 20 $ 20 97/98 East Entrance Mat raised at edges Secure entrance mat $ - $ - $ - Jul-97 Jul-97 West Entrance handrails do not extend 12"Install directional sign to access entrance $ 120 $ 26 $ 200 $ 226 97/98 West Entrance handrails do not extend 12"Extend handrails $ - Need Price 98/99 West Entrance Mat raised at edges Secure entrance mat $ - $ - $ - Jul-97 Jul-97 $ 212 Elevator Upgrade elevator to specifications Install signals, control panel, lighting, ER $ 13,000 $ 3,000 $ 3,000 97/98 $ 13,000 Elevator Hallway Counter protrudes 11 3/4"Remove counter $ 40 $ 100 $ 100 97/98 1st Floor Corridor Individual offices have turn handles Install lever handles $ 8,000 $ 8,000 $ 8,000 99/00 $ 8,040 Men's RR 1st Flr Alternate stall size Reconfigure to provide 5x5 stall $ 2,000 $ 1,020 $ 1,020 97/98 Men's RR 1st Flr Towels 62"Lower to 40-48 $ 10 $ 10 $ 10 97/98 Men's RR 1st Flr Toilet @ 21"Lower to 17-19" - New Toilet $ 444 $ 370 $ 370 97/98 Men's RR 1st Flr Sign mounted on door Get accessible sign, mount on wall $ 36 $ 26 $ 26 97/98 Men's RR 1st Flr TP mounted above grab bar @ 41"Mount below grab 12" in front of toilet $ 10 $ 10 $ 10 97/98 $ 2,500 Women RR 1st Flr Alternate stall size Reconfigure to provide 5x5 stall $ 2,000 $ 1,020 $ 1,020 97/98 Women RR 1st Flr Sanitary product controls @ 57"Lower to 40-48" $ 30 $ 20 $ 20 97/98 Women RR 1st Flr Towels @ 62"Lower to 40-48" $ 10 $ 10 $ 10 97/98 Women RR 1st Flr Toilet at 21"Lower to 17-19" - New Toilet $ 444 $ 370 $ 370 97/98 Women RR 1st Flr TP mounted above grab bar @ 41"Mount below grab 12" in front of toilet $ 10 $ 10 $ 10 97/98 Women RR 1st Flr Chair blocks path of travel Remove Chair $ - $ - $ - Oct-97 Women RR 1st Flr Sign mounted on door Get accessible sign, mount on wall $ 36 $ 26 $ 26 97/98 Women RR 1st Flr Sofa Obstructs turning space Remove Sofa $ - $ - $ - Oct-97 $ 2,530 Customer Serv Area Utility counter at 42"Lower section to 28-34" $ 3,600 $ 3,600 $ 3,600 98/99 Customer Serv Area Payment Counter at 42"Lower section to 28-34" $ 3,800 $ 3,800 $ 3,800 98/99 Customer Serv Area Payment drop protrudes 9"Build into wall $ - Incl Above 98/99 $ 7,400 Telephone Sign to indicate TTY at Reception $ 36 $ 26 $ 26 97/98 $ 36 Signage No way finding signs Install way finding signs (15) $ 540 $ 400 $ 400 97/98 Signage Offices have overhead signs Install room signs at 60" AFF (35 @ 26/ea) $ 1,260 $ 780 $ 780 97/98 Signage No signs to designate ER exits Install signs $ 144 In signage project? ?????? Signage "reserved" signs in chambers Remove $ 20 $ - $ - Aug-97 Aug-97 $ 1,964 Council Chambers Does not provide integrated seating Reconfigure to provide seating (50 seats) $ - $ 9,000 $ 9,000 97/98 Council Chambers No assistive listening device Portable device into PA w/ receivers 4 $ 895 $ 895 $ 895 97/98 ramp $ 3,200 $ 4,095 City Clerk's Office Service counter too high Lower section 4' to 28-34" $ 1,100 $ 145 $ 145 97/98 $ 1,100 Basement Restrooms Not accessible Interim: directional signs to 1st floor $ 36 $ 26 $ 26 97/98 Basement Restrooms Not accessible Reconfigure to provide access (Unisex?) $ 5,000 $ 2,500 $ 2,500 98/99 $ 5,036 Basement Fountain Not accessible Install accessible fountain $ 2,100 $ 1,100 $ 1,100 98/99 $ 2,100 Breakroom Turn handle entry door Lever hardware $ 200 $ 200 $ 200 98/99 Breakroom Sink 34", 25" knee, UC pipes, lever Remodel sink $ 1,300 $ 340 $ 340 98/99 Breakroom Soal 50 1/2"Lower 40-48" $ 10 $ 10 $ 10 98/99 Breakroom Towels 55"Lower 40-48" $ 10 $ 10 $ 10 98/99 $ 1,520 Basement General All turn hardware $ - Included above 98/99 Basement General No raised/Braille Signs $ - Included above 98/99 $ - subtotal $ 49,533 contingency $ 4,953 TOTAL $ 54,486 $ 17,402 $ 11,560 $ 8,200 $ 37,162 roundup $ 55,000 *************************** *************************** * COURT YOUTH (property transferred to LCPS) Parking one on-street - poorly painted with sign Repaint $ 30 $ 10 $ 10 97/98 Sidewalk Access of parking poor, 3/4" threshold, sidewalk too steep, uneven, cracked Replace 41' of sidewalk $ 1,300 $ 364 $ 364 97/98 Sidewalk Ramp Ramp too steep, uneven, raised, cracked Replace 70' of sidewalk and ramp $ 1,200 $ 2,000 $ 2,000 97/98 $ 2,530 Entry door Loop & button combination change lockset to allow open w/ loop alone $ 200 $ 200 $ 200 97/98 Entry door 8# pull pressure required Adjust door to 5# max & slower closing $ - $ 20 $ 20 97/98 $ 200 Entry Service 44 1/2" high Lower section to 28-34" $ 1,200 $ 145 $ 145 97/98 Fountain Obstructed by decorative tree Move tree to allow access $ - $ - $ - Dec-97 Signage 58-66" mounts OK $ - $ 1,200 Restrooms Entry 11# strength, closes slowly Adjust push/pull to 5# $ - $ 20 $ 20 97/98 Restrooms Entry vertical lever Replace with loop $ 200 $ 45 $ 45 97/98 Restrooms Sinks - men's is furthest from access stall Cover pipes in nearest sink $ 50 $ 30 $ 30 97/98 $ 250 Emergency Exits East has ramp, ends at locked fence Review means of egress once out of bldg $ - x 97/98 Emergency Exits West ramp too steep, 1/12" drop at base, rails 29" Reconfigure to 1:12, smooth transition, railing 34" and extended $ 2,500 $ 2,000 $ 2,000 97/98 $ 2,500 Activity Room Sink obstructed by waste containers Mover containers for forward access $ - $ - $ - Oct-97 Activity Room Table 29" w/ 26" knee height 1 Tbl 28-34" high w/ 27" knee height,19" depth $ 200 $ 325 $ 325 98/99 $ 200 Gym To be remodeled 1997-98 $ - $ - subtotal $ 6,880 contingency $ 688 TOTAL $ 7,568 $ 4,834 $ 325 $ - $ 5,159 roundup $ 7,608 *************************** *************************** * LAABS Pool (building demolished; replaced with new facility adj. to tennis courts) Picnic Tables 3 portable tables 28" knee, 17" seats Install 1 accessible picnic table $ 600 $ 600 Parking Sand/gravel lot, no designated parking Pave area for 1 Space, stripe, sign $ 650 $ 650 Entrances Both front entrances have stairs Ramp one entrance to building w/ rails $ 5,800 Entrances Steep ramp access to pool area 70" L 21% slope Eliminate $ 50 Entrances Gate at ramp marked "Handicap Entrance"Eliminate $ 10 $ 5,860 Drinking Fountain 34" high, turn controls, 7" clear under w/ curb Install accessible fountain $ 2,100 Signage None Install ADA signs at locker entrances $ 72 Telephone Standard phone behind counter, 0 vol ctrl Install phone with volume control Counter 39 1/2" high Remove and lower one section of counter to 34-36" $ 1,200 $ 3,372 Alarms None $ 700 $ 700 Doorways All 31" door openings- 3 into each locker Widen door openings to 32" minimum $ 5,400 $ 5,400 Women's Locker Rm No mirror $ - Women's Locker Rm Sink, 35", uncovered, push controls Lower to 34", cover pipes $ 420 Women's Locker Rm Dispenser mounted above sink @52"Lower to maximum of 48" $ 10 Women's Locker Rm 3 regular stalls Reconfigure to provide 1 accessible stall, looses one stall $ 1,210 Women's Locker Rm Stalls install grab bars and TP holder below grab $ 150 Women's Locker Rm Shower controls at 57", 0 grab bars/seats Install hand/wall spray unit on one shower $ 645 Women's Locker Rm Shower Controls Mount 1 shower control at 38-48" above floor $ 100 Women's Locker Rm Shower seat Purchase shower bench $ 200 $ 2,735 Men's Locker Room No mirror $ - Men's Locker Room Sink at 35", push ctrls, uncovered pipes Lower to 34", cover pipes $ 420 Men's Locker Room Dispenser over sink at 52"Lower to maximum of 48" $ 10 Men's Locker Room Stalls, regular, 0 grab bars Reconfigure to provide 1 accessible stall, looses one stall $ 1,360 Men's Locker Room Urinal 28", 50" at controls Install accessible urinal at 17", ctrls at 44" $ 370 Men's Locker Room Shower - open - ctrls at 60" push Install hand/wall spray unit on one shower $ 645 Men's Locker Room Shower Controls Mount 1 shower control at 38-48" above floor $ 100 Men's Locker Room Shower seat Purchase shower bench $ 200 $ 3,105 $ 3,105 Into Pool Area Steep 3' long ramp to pool area Lessen slope on ramp to 1:12 (men's & women's) $ 3,000 $ 3,000 subtotal $ 25,422 contingency $ 2,542 TOTAL $ 27,964 $ - $ - $ - $ - roundup $ 28,000